Laserfiche WebLink
Run Date: 9/26/2014 City of Everett-Public Works Department Cutoff Date: 8/1/2014 <br /> Time: 9:36 AM Contract Estimate Voucher <br /> Project: 300 For Work Order#3404 Contractor: Razz Construction, Inc., <br /> Horizon Elementary School Walk Route Estimate#6 4055 Hammer Drive <br /> Safety <br /> WO 3404 BID:$539,342.48 Bellingham,WA 98226 <br /> TOTAL BID:$539,342.48 <br /> • <br /> Unit Plan Total Previous Present Total Previous Present <br /> Item# Description Units Price Quantity Quantity Quantity Quantity Amount Amount Amount <br /> 0028 Renegotiated Sidewalk Removal& LS 4,932.06 1.00 1.0000 0.0000 1.0000 4,932.06 0.00 4,932.06 <br /> Replacement <br /> 0029 Recuperative Engineering Costs LS -26,874.58 1.00 1.0000 0.0000 1.0000 -26,874.58 0.00 -26,874.58 <br /> 0100 MOH-Pulibox Base and Cover-WSOOT EA 986.00 7.00 0.0000 0.0000 0.0000 0.00 0.00 0.00 <br /> 0101 MOH-2 each Radar Speed Units LS 8,028.00 1.00 0.0000 0.0000 0.0000 0.00 0.00 0.00 <br /> 0102. MOH Schoold Speed Warning System Pole 1- DOLLA 1.00 14,784.00 0.0000 0.0000 0.0000 0.00 0.00 0.00 <br /> 5 <br /> Work Order Totals: 536,741.89 517,524.41 10,217.48 <br /> CO <br /> CO <br /> • <br /> • <br /> O-; <br />