My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015/01/28 Council Agenda Packet
>
Council Agenda Packets
>
2015
>
2015/01/28 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2020 10:42:16 AM
Creation date
6/15/2020 10:40:44 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
1/28/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET <br /> PROJECT TITLE: <br /> Call for Bids for the 2811 X Briefing COUNCIL BILL# <br /> Warehouse Conversion Project Proposed Action Originating Department Facilities <br /> Consent Contact Person Chris Lark <br /> Action Phone Number 425-257-8897 <br /> First Reading FOR AGENDA OF Jan. 28, 2015 <br /> Second Reading <br /> Third Reading <br /> Public Hearing • <br /> Initialed by: <br /> Department Head <br /> CAA �1b <br /> Council President 4 6 <br /> Location Preceding Action Attachments Department(s)Approval <br /> 2811 Oakes Ave. Seismic Retrofit Project None Fire Department <br /> Amount Budgeted $650,000 <br /> Expenditure Required $540,000 Account Number(s): <br /> Budget Remaining -0- Facilities Fund 146—Repair&Maintenance <br /> Additional Required -0- <br /> • <br /> DETAILED SUMMARY STATEMENT: <br /> Plans and Specifications have been prepared for the 2811 Warehouse Conversion Project. Fire Department <br /> equipment and supplies were moved to the second floor of the Wall Street Building to accommodate the <br /> Seismic Retrofit Project.The purpose of this project will be to convert the former administration space at <br /> 2811 Oakes into warehouse space for the Fire Department and relocate the equipment and supplies that arc <br /> currently located in the Wall Street Building. <br /> The Engineers Estimate for the project is $540,000. The amount budgeted includes sales tax and <br /> construction contingencies. Funding for the project will come from the Facilities Repair and Maintenance <br /> Fund. <br /> RECOMMENDATION (Exact action requested of Council): <br /> Accept the Call for Bids for the 2811 Warehouse Conversion Project to be received no later than 2:00 PM on <br /> March 10, ' 5. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.