Laserfiche WebLink
/11/4/1!IIII'mA <br /> PUBLIC WORKS <br /> • A site map with all required features per Volume I, Section 3.1.7 of the <br /> Manual. <br /> • A soils map is provided,but should be updated to reflect the soils found on <br /> the project site as verified by field testing conducted by Kleinfelder or <br /> others who perform infiltration feasibility assessment of the site. <br /> iii. The discussion provided in Section 5.0.D in the SSP indicates that roof LID <br /> controls are infeasible because of vertical constraints of the existing storm drainage <br /> system, but the documentation provided does not clearly demonstrate those <br /> constraints. The documentation also indicates that perforated stub-out connections <br /> are not feasible because the proposed roof drains would connect to an existing <br /> hardline system instead. MR#5 requires evaluating LID BMPs for roof surfaces <br /> based on a prescribed order and implementing the first BMP that is not <br /> demonstrated to be infeasible for managing roof runoff. The documentation <br /> provided does not demonstrate that perforated stub-outs are infeasible. Please <br /> revisit the LID BMP selection to select the first BMP from List#1 for roofs that is <br /> not demonstrated to be infeasible per the criteria of the Manual. <br /> iv. No conveyance analysis is provided. Please address conveyance sizing by provide <br /> sizing calculations for proposed conveyance facilities or otherwise documenting <br /> that the pipe sizes will meet the City's conveyance standards. <br /> v. No sizing calculations for the oil water separator are provided. Please provide <br /> calculations for sizing the oil water separator in accordance with the Manual to <br /> ensure that it has adequate capacity. If any flow splitters are proposed to control <br /> flow rates to the oil water separator, sizing calculations for those flow splitter(s) <br /> need to be provided. Otherwise, if no flow splitters are proposed,the calculations <br /> to size the oil water separator must demonstrate that the entire flow will be treated <br /> by the proposed design. <br /> • Sheet C5.0 (Drainage and Utility Plan) -Add Required Notes for Storm <br /> Drainage Plans from Section 4-2.7 of the City's Design and Construction <br /> Standards and Specifications. <br /> • Sheet 6.1 (Construction Notes and Details) - Oil/Water Separator details <br /> appear to be generic details with no design provided. The details need to <br /> indicate pipe invert elevations and diameters, flow splitters (if applicable), <br /> etc. Per the above comment on Oil Water Separator Sizing,the details need <br /> to reflect the results of calculations performed to size the facilities in <br /> accordance with the Manual. <br /> ' Page 3 of 3 <br />