My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10200 19TH AVE SE COSTCO FUEL STATION 2022-05-23
>
Address Records
>
19TH AVE SE
>
10200
>
COSTCO FUEL STATION
>
10200 19TH AVE SE COSTCO FUEL STATION 2022-05-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2022 1:20:34 PM
Creation date
6/15/2020 11:14:14 AM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
10200
Tenant Name
COSTCO FUEL STATION
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
392
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
e. <br /> , <br /> Y_ <br /> PUBLIC WORKS <br /> '3i-tolVimmA <br /> A <br /> b. Please see all redlines on the attached plans for required corrections in addition to all <br /> comments listed below. Frequently, redlines will be stand-alone and will not have an <br /> associated item in this corrections letter.Likewise,comments below may not have associated <br /> redlines. Please indicate to the City that all redlines have been adequately addressed by <br /> providing checkmarks or notes next to the City's redlines to indicate that it has been picked <br /> up or to answer a reviewer's question. A comment response letter can also be included with <br /> your resubmittal to address the comments below(handwritten remarks under each comment <br /> on this letter are perfectly acceptable). The below listed sheets have redlines. <br /> Vr i. Sheet C1.0 <br /> ��i. Sheet C2.0 <br /> �s/�iii. Sheet C3.0 <br /> V i�'. Sheet C4.0 <br /> V`'. Sheet C5.0 <br /> 2. The comments below were generated from this project's Stormwater Reviewer. If you have any <br /> questions regarding these comments,please contact Erik Emerson with the City of Everett Surface <br /> Water Division(425-257-8995 or EEmerson@everettwa.gov). <br /> i. A soils report from 2015 is provided in Section 7 of the SSP, but this soils report <br /> does not provide the required information regarding infiltration feasibility <br /> assessment. If poor infiltration is used as justification for LID BMP infeasibility, <br /> an appropriate infiltration study will be required. <br /> ii. The SSP provides limited documentation, but does not provide all the required <br /> documentation as listed in the Stormwater Management Manual. As an example, <br /> Section 5.0.A of the SSP provides a brief sentence on existing site hydrology, but <br /> does not provide required documentation regarding delineation and acreage of <br /> areas contributing runoff to the site,flow control facility location,outfall,overflow <br /> route, and natural streams and drainage features. See Volume I, Section 3.1.5 of <br /> the Manual for detailed requirements for each of the following elements: <br /> • Totals of new hard surfaces,replaced hard surfaces,and converted pervious <br /> surfaces <br /> • Discussion of infiltration feasibility based on documentation provided in <br /> the soils report(see above comment for Step 1) <br /> • Maintenance instructions for On-site Stormwater Management BMPs need <br /> to be provided. <br /> • Update the vicinity map to show the route of stormwater off-site to the local <br /> natural receiving water, significant geographic features and <br /> sensitive/critical areas (streams, wetlands, lakes, steep slopes, etc.). If no <br /> geographic features or sensitive/critical areas exist on-site or along the <br /> identified route to the receiving water, that should be stated in the SSP. <br /> (!age 2 of3 ,--<< <br /> �.�....,.....�...gip <br />
The URL can be used to link to this page
Your browser does not support the video tag.