Laserfiche WebLink
2 Construction Stormwater Best Management Practices (BMPs) <br /> The SWPPP is a living document reflecting current conditions and changes throughout the life <br /> of the project. These changes may be informal (i.e., hand-written notes and deletions). Update <br /> the SWPPP when the CESCL has noted a deficiency in BMPs or deviation from original design. <br /> 2.1 The 13 Elements <br /> 2.1.1 Element 1: Preserve Vegetation / Mark Clearing Limits <br /> List and describe BMPs: In order to protect adjacent properties and to reduce the area of soil <br /> exposed to construction, the limits of construction will be clearly marked and enclosed within a <br /> construction fence prior to any land disturbing activities. This fence will encompass all areas <br /> subject to construction, as well as delineate all areas where no construction is to take place. A <br /> silt fence will also be placed in certain areas as shown on the accompanying Site Plan in order <br /> to protect the soil and vegetation outside the construction area. Refer to Appendix B: <br /> Construction BMPs for detailed drawings of the proposed BMPs. The proposed BMPs relevant <br /> to vegetation preservation/clearing limits are: <br /> • BMP C103: High Visibility Plastic or Metal Fence <br /> • BMP C233: Silt Fence <br /> Installation Schedules: BMPs listed above (Silt Fence and High Visibility Plastic or Metal <br /> Fence)will be installed prior to any land disturbing activity. <br /> Inspection and Maintenance plan: TBD <br /> Responsible Staff: TBD <br /> Page 16 <br />