My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10200 19TH AVE SE COSTCO FUEL STATION 2022-05-23
>
Address Records
>
19TH AVE SE
>
10200
>
COSTCO FUEL STATION
>
10200 19TH AVE SE COSTCO FUEL STATION 2022-05-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2022 1:20:34 PM
Creation date
6/15/2020 11:14:14 AM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
10200
Tenant Name
COSTCO FUEL STATION
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
392
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 Construction Stormwater Best Management Practices (BMPs) <br /> The SWPPP is a living document reflecting current conditions and changes throughout the life <br /> of the project. These changes may be informal (i.e., hand-written notes and deletions). Update <br /> the SWPPP when the CESCL has noted a deficiency in BMPs or deviation from original design. <br /> 2.1 The 13 Elements <br /> 2.1.1 Element 1: Preserve Vegetation / Mark Clearing Limits <br /> List and describe BMPs: In order to protect adjacent properties and to reduce the area of soil <br /> exposed to construction, the limits of construction will be clearly marked and enclosed within a <br /> construction fence prior to any land disturbing activities. This fence will encompass all areas <br /> subject to construction, as well as delineate all areas where no construction is to take place. A <br /> silt fence will also be placed in certain areas as shown on the accompanying Site Plan in order <br /> to protect the soil and vegetation outside the construction area. Refer to Appendix B: <br /> Construction BMPs for detailed drawings of the proposed BMPs. The proposed BMPs relevant <br /> to vegetation preservation/clearing limits are: <br /> • BMP C103: High Visibility Plastic or Metal Fence <br /> • BMP C233: Silt Fence <br /> Installation Schedules: BMPs listed above (Silt Fence and High Visibility Plastic or Metal <br /> Fence)will be installed prior to any land disturbing activity. <br /> Inspection and Maintenance plan: TBD <br /> Responsible Staff: TBD <br /> Page 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.