Laserfiche WebLink
2.1.3 Element 3: Control Flow Rates <br /> Will you construct stormwater retention and/or detention facilities? <br /> ® Yes❑ No <br /> Will you use permanent infiltration ponds or other low impact development (example: <br /> rain gardens, bio-retention, porous pavement)to control flow during construction? <br /> ❑ Yes® No <br /> List and describe BMPs: Excavation for the project site is expected to cover less than 10,000 <br /> square feet. Increased flow rates will be minimal, and dirt and native soils will not be exposed <br /> for extended periods of time. <br /> Installation Schedules: TBD <br /> Inspection and Maintenance plan: TBD <br /> Responsible Staff: TBD <br /> Page 18 <br />