Laserfiche WebLink
2.1.8 Element 8: Stabilize Channels and Outlets <br /> Provide stabilization, including armoring material, adequate to prevent erosion of outlets, <br /> adjacent stream banks, slopes, and downstream reaches, will be installed at the outlets of all <br /> conveyance systems. <br /> List and describe BMPs: The project site is located west of the Cascade Mountain Crest. As <br /> such, where there are any temporary on-site conveyance channels, they shall be designed, <br /> constructed, and stabilized to prevent erosion from the expected peak 10-minute velocity of flow <br /> from a Type 1A, 10-year, 24-hour recurrence interval storm for the developed condition. At this <br /> time, no temporary on-site conveyance channels are being proposed. The small area of <br /> disturbance will not require significant on-site conveyance during construction. <br /> Installation Schedules: TBD <br /> Inspection and Maintenance plan: TBD <br /> Responsible Staff: TBD <br /> Page 113 <br />