My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10200 19TH AVE SE COSTCO FUEL STATION 2022-05-23
>
Address Records
>
19TH AVE SE
>
10200
>
COSTCO FUEL STATION
>
10200 19TH AVE SE COSTCO FUEL STATION 2022-05-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2022 1:20:34 PM
Creation date
6/15/2020 11:14:14 AM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
10200
Tenant Name
COSTCO FUEL STATION
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
392
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.1.9 Element 9: Control Pollutants <br /> List and describe BMPs: All pollutants, including waste materials and demolition debris, that <br /> occur on site will be handled and disposed of in a manner that does not cause contamination of <br /> stormwater. Good housekeeping and preventative measures will be taken to ensure that the <br /> site will be kept clean, well-organized, and free of debris. The following BMPs will be <br /> implemented: <br /> • All vehicles, equipment, and petroleum product storage/dispensing areas will be <br /> inspected regularly to detect any leaks or spills, and to identify maintenance needs to prevent <br /> leaks or spills. <br /> • In order to perform emergency repairs on site, temporary plastic will be placed beneath <br /> and, if raining, over the vehicle. <br /> • Any chemicals stored in the construction areas will conform to the appropriate source <br /> control BMPs listed in Volume IV of the Ecology stormwater manual. All chemicals shall have <br /> cover, containment, and protection provided on site, pursuant to BMP C153 for Material <br /> Delivery, Storage and Containment. <br /> Proposed BMPs applicable to Pollutant Control: <br /> • BMP C140: Dust Control <br /> • BMP C151: Concrete Handling <br /> • BMP C 152: Sawcutting and Surface Pollution Prevention <br /> • BMP C154: Concrete Washout Area <br /> Installation Schedules: BMPs shall be installed as necessary to control pollutants for the <br /> duration of construction. <br /> Inspection and Maintenance plan: TBD <br /> Responsible Staff: TBD <br /> Will maintenance, fueling, and/or repair of heavy equipment and vehicles occur on-site? <br /> ❑ Yes►1 No <br /> Will wheel wash or tire bath system BMPs be used during construction? <br /> ® Yes❑ No <br /> Will pH-modifying sources be present on-site? <br /> ® Yes❑ No <br /> Page 114 <br />
The URL can be used to link to this page
Your browser does not support the video tag.