My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10200 19TH AVE SE COSTCO FUEL STATION 2022-05-23
>
Address Records
>
19TH AVE SE
>
10200
>
COSTCO FUEL STATION
>
10200 19TH AVE SE COSTCO FUEL STATION 2022-05-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2022 1:20:34 PM
Creation date
6/15/2020 11:14:14 AM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
10200
Tenant Name
COSTCO FUEL STATION
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
392
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.1.11 Element 11: Maintain BMPs <br /> All temporary and permanent Erosion and Sediment Control (ESC) BMPs shall be maintained <br /> and repaired as needed to ensure continued performance of their intended function. <br /> Maintenance and repair shall be conducted in accordance with each particular BMP <br /> specification (see Volume ll of the SWMMWW or Chapter 7 of the SWMMEW). <br /> Visual monitoring of all BMPs installed at the site will be conducted at least once every calendar <br /> week and within 24 hours of any stormwater or non-stormwater discharge from the site. If the <br /> site becomes inactive and is temporarily stabilized, the inspection frequency may be reduced to <br /> once every calendar month. <br /> All temporary ESC BMPs shall be removed within 30 days after final site stabilization is <br /> achieved or after the temporary BMPs are no longer needed. <br /> Trapped sediment shall be stabilized on-site or removed. Disturbed soil resulting from removal <br /> of either BMPs or vegetation shall be permanently stabilized. <br /> Additionally, protection must be provided for all BMPs installed for the permanent control of <br /> stormwater from sediment and compaction. BMPs that are to remain in place following <br /> completion of construction shall be examined and restored to full operating condition. If <br /> sediment enters these BMPs during construction, the sediment shall be removed and the facility <br /> shall be returned to conditions specified in the construction documents. <br /> Page 117 <br />
The URL can be used to link to this page
Your browser does not support the video tag.