My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10200 19TH AVE SE COSTCO FUEL STATION 2022-05-23
>
Address Records
>
19TH AVE SE
>
10200
>
COSTCO FUEL STATION
>
10200 19TH AVE SE COSTCO FUEL STATION 2022-05-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2022 1:20:34 PM
Creation date
6/15/2020 11:14:14 AM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
10200
Tenant Name
COSTCO FUEL STATION
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
392
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.1.12 Element 12: Manage the Project <br /> The project will be managed based on the following principles: <br /> • Projects will be phased to the maximum extent practicable and seasonal work limitations <br /> will be taken into account. <br /> • Inspection and monitoring: <br /> o Inspection, maintenance and repair of all BMPs will occur as needed to ensure <br /> performance of their intended function. <br /> o Site inspections and monitoring will be conducted in accordance with Special <br /> Condition S4 of the CSWGP. Sampling locations are indicated on the Site Map. <br /> Sampling station(s) are located in accordance with applicable requirements of <br /> the CSWGP. <br /> • Maintain an updated SWPPP. <br /> o The SWPPP will be updated, maintained, and implemented in accordance with <br /> Special Conditions S3, S4, and S9 of the CSWGP. <br /> As site work progresses the SWPPP will be modified routinely to reflect changing site <br /> conditions. The SWPPP will be reviewed monthly to ensure the content is current. <br /> Table 2—Management <br /> ® Design the project to fit the existing topography, soils, and drainage patterns <br /> ❑ Emphasize erosion control rather than sediment control <br /> ❑ Minimize the extent and duration of the area exposed <br /> ❑ Keep runoff velocities low <br /> ❑ Retain sediment on-site <br /> ® Thoroughly monitor site and maintain all ESC measures <br /> ❑ Schedule major earthwork during the dry season <br /> ❑ Other (please describe) <br /> Page 118 <br />
The URL can be used to link to this page
Your browser does not support the video tag.