Laserfiche WebLink
2.1.13 Element 13: Protect Low Impact Development (LID) BMPs <br /> List and describe BMPs: A rain garden for canopy roof drain runoff will need to be protected <br /> during construction. Activities associated with the Fuel Facility Expansion may result in <br /> sediment contaminating the LID BMP. A high visibility screen will be installed surrounding the <br /> rain garden. In addition, any sediment contaminated soil in the rain garden will be removed and <br /> replaced after construction activities have ended. <br /> • BMP C103: High Visibility Screen/Fence <br /> Installation Schedules: High Visibility Fence will be provided after completion of the Rain <br /> Garden and will be maintained for the duration of the project. <br /> Inspection and Maintenance plan: TBD <br /> Responsible Staff: TBD <br /> Page 119 <br />