My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10200 19TH AVE SE COSTCO FUEL STATION 2022-05-23
>
Address Records
>
19TH AVE SE
>
10200
>
COSTCO FUEL STATION
>
10200 19TH AVE SE COSTCO FUEL STATION 2022-05-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2022 1:20:34 PM
Creation date
6/15/2020 11:14:14 AM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
10200
Tenant Name
COSTCO FUEL STATION
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
392
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 Monitoring and Sampling Requirements <br /> Monitoring includes visual inspection, sampling for water quality parameters of concern, and <br /> documentation of the inspection and sampling findings in a site log book. A site log book will be <br /> maintained for all on-site construction activities and will include: <br /> • A record of the implementation of the SWPPP and other permit requirements <br /> • Site inspections <br /> • Stormwater sampling data <br /> The site log book must be maintained on-site within reasonable access to the site and be made <br /> available upon request to Ecology or the local jurisdiction. <br /> Numeric effluent limits may be required for certain discharges to 303(d) listed waterbodies. See <br /> CSWGP Special Condition S8 and Section 5 of this template. <br /> 4.1 Site Inspection <br /> Site inspections will be conducted at least once every calendar week and within 24 hours <br /> following any discharge from the site. For sites that are temporarily stabilized and inactive, the <br /> required frequency is reduced to once per calendar month. <br /> The discharge point(s) are indicated on the Site Map (see Appendix A)and in accordance with <br /> the applicable requirements of the CSWGP. <br /> 4.2 Stormwater Quality Sampling <br /> 4.2.1 Turbidity Sampling <br /> Requirements include calibrated turbidity meter or transparency tube to sample site discharges <br /> for compliance with the CSWGP. Sampling will be conducted at all discharge points at least <br /> once per calendar week. <br /> Method for sampling turbidity: <br /> Table 4—Turbidity Sampling Method <br /> ❑ Turbidity Meter/Turbidimeter(required for disturbances 5 acres or greater in size) <br /> Transparency Tube (option for disturbances less than 1 acre and up to 5 acres in size) <br /> The benchmark for turbidity value is 25 nephelometric turbidity units (NTU) and a transparency <br /> less than 33 centimeters. <br /> If the discharge's turbidity is 26 to 249 NTU or the transparency is less than 33 cm but equal to <br /> or greater than 6 cm, the following steps will be conducted: <br /> 1. Review the SWPPP for compliance with Special Condition S9. Make appropriate <br /> revisions within 7 days of the date the discharge exceeded the benchmark. <br /> Page 121 <br />
The URL can be used to link to this page
Your browser does not support the video tag.