My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10200 19TH AVE SE COSTCO FUEL STATION 2022-05-23
>
Address Records
>
19TH AVE SE
>
10200
>
COSTCO FUEL STATION
>
10200 19TH AVE SE COSTCO FUEL STATION 2022-05-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2022 1:20:34 PM
Creation date
6/15/2020 11:14:14 AM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
10200
Tenant Name
COSTCO FUEL STATION
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
392
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Immediately begin the process to fully implement and maintain appropriate source <br /> control and/or treatment BMPs as soon as possible. Address the problems within 10 <br /> days of the date the discharge exceeded the benchmark. If installation of necessary <br /> treatment BMPs is not feasible within 10 days, Ecology may approve additional time <br /> when the Permittee requests an extension within the initial 10-day response period. <br /> 3. Document BMP implementation and maintenance in the site log book. <br /> If the turbidity exceeds 250 NTU or the transparency is 6 cm or less at any time, the following <br /> steps will be conducted: <br /> 1. Telephone or submit an electronic report to the applicable Ecology Region's <br /> Environmental Report Tracking System (ERTS)within 24 hours. <br /> • Northwest Region (Island, King, Kitsap, San Juan, Skagit, Snohomish, and <br /> Whatcom counties) (425-649-7000) or <br /> http://www.ecv.wa.aov/programs/spills/forms/nerts online/SWRO nerts online.html <br /> 2. Immediately begin the process to fully implement and maintain appropriate source <br /> control and/or treatment BMPs as soon as possible. Address the problems within 10 <br /> days of the date the discharge exceeded the benchmark. If installation of necessary <br /> treatment BMPs is not feasible within 10 days, Ecology may approve additional time <br /> when the Permittee requests an extension within the initial 10-day response period <br /> 3. Document BMP implementation and maintenance in the site log book. <br /> 4. Continue to sample discharges daily until one of the following is true: <br /> • Turbidity is 25 NTU (or lower). <br /> • Transparency is 33 cm (or greater). <br /> • Compliance with the water quality limit for turbidity is achieved. <br /> o 1 - 5 NTU over background turbidity, if background is less than 50 NTU <br /> o 1% - 10% over background turbidity, if background is 50 NTU or greater <br /> • The discharge stops or is eliminated. <br /> Page X22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.