Laserfiche WebLink
Ms. Lupe Sandoval <br /> CRM Architects&Planners, Inc. <br /> Plan Check Number: B1805014, First Review <br /> January 10, 2019 <br /> Revisions to plans have been clouded with Delta 4. Please see Sheet G-001 revisions box <br /> for description. <br /> General: <br /> 1. No additional comment. <br /> 2. No additional comment. <br /> Fire Protection: <br /> 3. This comment has not been completely addressed. The original comment stated the <br /> stainless steel panel behind the Type 1 hoods shall extend at least 18 inches in all directions <br /> from the hood. See the Exception in IMC Section 507.2.6. The following comments shall be <br /> addressed: <br /> a. Detail 9/A-403 appears to show the steel panel located underneath an additional layer of <br /> 5/8"GWB. The panel shall be located over the GWB. <br /> Response: See revised Detail 9/A-403 with the stainless steel panel shown over the 5/8" <br /> Type X Gyp. Bd. <br /> b. Detail 6/A-404 appears to show the panels extending from the perimeter of the hood. <br /> The panels shall also be located behind the hood. <br /> Response: See revised Detail 6/A-404 with the stainless steel panel shown behind the hood. <br /> References to see Detail 9/A-403 have been added. <br /> c. Detail 9/A-403 specifies the wall framing as wood or metal studs. The wall construction <br /> shall be limited to non-combustible framing. The reference to wood studs shall be <br /> removed. See also Floor Plan 1/A-103 and Wall Types W1 and W5 on Sheet G-005. <br /> Response: See revised Detail 9/A-403 showing metal steel stud construction for wall. <br /> 4. This comment has not been completely addressed. Sheet A-105 states that the grease <br /> ducts have 1-hour wrap. Detail 5/M-500 specifies 2-hour wrap. The following comments <br /> shall be addressed: <br /> a. No additional comment. <br /> b. The wrap in Detail 5/M-500 shall extend at least 18-inches above all combustible <br /> materials (e.g., wood blocking, etc.). The detail specify the wrap to extend 18"above <br /> the roof, not the blocking. The clearance shall be provided above all combustible <br /> materials. See IBC Section 506.3.6. <br /> Response: See revised Sheet M-500 and LMR's response letter attached. <br /> O3200 Cedar Street O442255.225577.88800 goeverettwa. ov <br /> Everett,WA 98201 882 fax /7 everettwa. <br />