Laserfiche WebLink
MIN <br /> CITY OF EVERETT <br /> EVERETT Permit Services <br /> WASHINGTON <br /> September 11, 2019 <br /> Ms. Lupe Sandoval <br /> CRM Architects & Planners, Inc. <br /> 5800 Stanford Ranch Road, Suite 720 <br /> Rocklin, CA 95765 <br /> Email Address: lupes@crmarchitects.com <br /> RE: Owner: CFT NW Developments, LLC <br /> Job Address: 8417 Evergreen Way <br /> Plan Check Number: M1908-059, First Building Review <br /> Dear Ms. Sandoval, <br /> The proposed project has been reviewed for compliance with the provisions of the building codes <br /> adopted and amended by the state of Washington and the city of Everett. The comments below <br /> must be addressed before a permit can be issued. These comments address building. Additional <br /> revisions or additions may be required by other departments including Public Works, Planning, and <br /> Fire. <br /> Code citations provided in the following comments reference the 2015 International Building Code <br /> (IBC), the 2015 International Existing Building Code (IEBC), the 2015 International Property <br /> Maintenance Code (IPMC), the 2015 International Fire Code (IFC), the 2015 International <br /> Mechanical Code (IMC), and the 2015 International Energy Conservation (IECC), and the 2015 <br /> Washington State Energy Code (WSEC). The current IBC referenced standard for accessible design <br /> is the 2009"Accessible and Usable Buildings and Facilities"(ICC/ANSI A117.1). Federal ADA, FHA, <br /> and HUD regulations and standards, including the Fair Housing Accessibility Guidelines, may be <br /> more restrictive. References to other design standards include the current edition. <br /> In order for the processing of your application to continue, the following documentation shall be <br /> submitted to the Building Division for review: <br /> a. Itemized letter addressing the comments provided below. <br /> b. Two complete sets of revised construction drawings. <br /> c. One copy of structural calculations. <br /> Submittal documents shall contain sufficient information and detail to review the proposed project <br /> for compliance with the adopted codes. Upon submittal of the revised documents, your application <br /> will be given priority and plan reviews will recommence. <br /> ( Page 1 of 3 <br />