My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2602 CLEVELAND AVE 2020-06-16
>
Address Records
>
CLEVELAND AVE
>
2602
>
2602 CLEVELAND AVE 2020-06-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2020 12:09:50 PM
Creation date
6/16/2020 11:54:03 AM
Metadata
Fields
Template:
Address Document
Street Name
CLEVELAND AVE
Street Number
2602
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INFORMATION FOR THE DEVELOPER <br /> Planning Department Comments—Kelsey Heyd—425.257.7275: <br /> 1. If a complete application has not been filed for a building permit or equivalent construction <br /> permit within eighteen(18)months from the approval date of this decision,the permit shall be <br /> deemed terminated,unless an extension is granted. If the permittee requests an extension in <br /> writing not later than eighteen(18)months from the land use permit date,the Director may grant <br /> a six (6)month extension. <br /> 2. This is an administrative decision that may be appealed to the City's Land Use Hearing Examiner. <br /> An appeal must be filed with the City within 14 days of the date of this notice. If you have <br /> questions regarding this proposal or if you wish to file an appeal,please contact Kelsey Heyd, <br /> City of Everett Planning Department, at 425.257.8731 or 7275. <br /> Engineering/Permit Services Department Comments—Benyam Stephanos—425.257.7289: <br /> 1. A Public Works Permit is required for this project. Detailed drawings in accordance with <br /> City Design and Construction Standards shall be submitted to the Public Works Department, <br /> showing site parking layout, landscaping, utilities, storm drainage, temporary construction <br /> erosion control, and all required improvements in the public right-of-way. Public Works <br /> Department approval of these drawings is required prior to any peuiiits being issued. All <br /> improvements shall be completed, approved and warranted before the Occupancy Permit is <br /> issued/final approval is granted. <br /> 2. Any grading/fill on this site shall be done so as to not impact the surrounding properties. <br /> 3. This project must comply with the current City of Everett Building Code and Sprinkler <br /> Ordinance. <br /> 4. Stormwater shall be managed in accordance with the City's 2010 Storm water Management <br /> Manual". Downspout cannot be connected to side sewer. Downspout runoff should not <br /> impact the neighboring properties. <br /> 5. Approval of construction plans will require demonstration that all pertinent standards and <br /> regulations are met. <br /> 6. City streets are to be kept clear of dirt and debris at all times during construction. Dust <br /> suppression and street cleaning must occur as directed by the Public Works Inspector. <br /> 7. Lack of comment on the plans submitted with the application does not constitute approval of <br /> these plans. <br /> 8. Any broken or damaged sidewalk shall be repaired/replaced per the City Public Works <br /> Inspector. <br /> 9. All exposed ground must be reseeded within 30 days of the completion of construction. If <br /> reseeding is not practical due to weather or seasonal problems, the ground must be covered <br /> with mulch as directed by the City Engineer. <br /> 10. Temporary erosion control measures for construction activity must be operational prior to <br /> commencement of any clearing or earthwork. <br /> 2of2 <br /> RE -017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.