My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2828 COLBY AVE 2020-06-16
>
Address Records
>
COLBY AVE
>
2828
>
2828 COLBY AVE 2020-06-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2020 1:56:22 PM
Creation date
6/16/2020 1:53:52 PM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
2828
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Egress: <br /> 1. A note has been added to the floor plan regarding two-way communication <br /> system complying with section 1009.8 <br /> 2. It is technically not feasible to provide a full 12" extension of the north handrail at <br /> the bottom of the east stair. The plan has been modified to show the rail <br /> extending approximately 9" and returning to the support wall. Per our <br /> conversation the foregoing will be accepted <br /> 3. The door ratings shown in the door schedule have been revised to comply with <br /> table 716.5 <br /> 4. The closet at the third floor landing of the east stairwell has been eliminated. <br /> Accessibility: <br /> 1. Enlarged plans-drawing floor plan note ceiling for installation of insulation <br /> complying with SNSI section 606.6 has been added <br /> 2. Partitions shown in detail 3A/A614 are floor mounted. Drawing has been revised <br /> to show a partition support post installed at the end of the HC rail.The addition <br /> of the post will meet the requirement of ANSI section 609.8 <br /> Structural <br /> 1. A letter of response from Engineers Northwest is appended to this letter. <br /> 2. Supplementary calculations made by Engineers Northwest is appended to this <br /> letter. <br /> Should you have any additional comments, please contact our office at your earliest <br /> convenience. <br /> Best Regard , <br /> A ary O'L7 <br /> y <br /> Attachments: <br /> 1. USG wall performance selector <br /> 2. USG 2-hour corridor detail <br /> 3. Engineers Northwest letter dated March 16, 2018 <br /> 4. Engineers Northwest Supplemental calculations dated March 16, 2018 <br /> PAGE 2 IR <br />
The URL can be used to link to this page
Your browser does not support the video tag.