Laserfiche WebLink
1/10/2020 City of Everett page i '7 <br /> 11:47:07AM G' <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. B1801-002 Site Address 2828 COLBY AVE <br /> Applied 1/5/2018 Applicant OLEARY GARY Lot <br /> Approved 4/13/2018 Owner TEC HOLDINGS 84 LLC Block <br /> Issued 4/13/2018 Contractor OWNER Tract <br /> Parent Permit No. Description ADD TOILET ROOMS,STAIRS&ELEVATOR SHAFT <br /> Notes ELEVATOR REQUIRES FIRE ALARM <br /> Scheduled Comnleted Tyne Insnector Result Remarks Inspector's Comments <br /> 6/5/2018 6/5/2018 BLDG 13-OTHER DWF CORRECTION Not ready,Install 1st <br /> layer rated wall <br /> 6/6/2018 6/6/2018 BLDG DWF PARTIAL APPR Elevator shaft walls east and west only. <br /> 09-DRYWALL OK to cover <br /> Interior of shaft <br /> 1,2&3floor <br /> 6/11/2018 6/11/2018 BLDG DWF PARTIAL APPR 3rd and 4th floors elevator shaft walls-side <br /> 09-DRYWALL walls only(east and west). <br /> Need rap beams in hoist shaft framing-fire <br /> protection. <br /> 6/13/2018 6/13/2018 BLDG DWF PARTIAL APPR Mechanical,elevator <br /> 09-DRYWALL room walls only <br /> 6/14/2018 6/14/2018 BLDG DWF PARTIAL APPR Elevator-mechanical room drywall <br /> 09-DRYWALL complete. <br /> OK to cover walls/ceiling <br /> 7/17/2018 7/17/2018 BLDG DWF PARTIAL APPR 2nd floor-Bathroom walls only <br /> 08-FRAMING Subject to electrical rough in sign off before <br /> cover. <br /> 7/20/2018 ' 7/20/2018 BLDG DWF APPROVAL Bathrooms(men's and women's)It floor <br /> 08-FRAMING (basement)OK to cover. <br /> 7/20/2018 7/20/2018 BLDG DWF PARTIAL APPR Exterior wall of elevator shaft(4th floor <br /> 09-DRYWALL west wall,street side-colby)elevation. <br /> Subject to:contactor completes fire <br /> caulking holes,toggles,and condut holes. <br /> Then OK to install(cover with next layer). <br /> 7/24/2018 7/24/2018 BLDG DWF PARTIAL APPR 2nd floor street side(Colby). <br /> 09-DRYWALL 1st layer of 2nd with offset <br /> OK to cover. <br /> 7/25/2018 7/25/2018 BLDG DWF PARTIAL APPR 2nd floor elevator wall <br /> 09-DRYWALL 3rd floor exterior(colby street side) <br /> Drywall nailing <br /> Rated wall <br /> 4th floor interior elevator shaft with off set <br /> OK to cover(mud/tape). <br /> 8/2/2018 8/2/2018 BLDG DWF PARTIAL APPR Elevator-front's(1-4 floors) <br /> 08-FRAMING 1"core board <br /> Fire caulk holes(conduits) <br /> 1.Fire-caulk and(tape-splice joint) <br /> 2.Fire-caulk and(tape-splice joint) <br /> 3.Fire-caulk and(tape-splice joint) <br /> 4.Fire-caulk and(tape-splice joint) <br /> and front-main floor(lobby) <br /> Then OK to install next drywall sheat. <br /> 8/2/2018 8/2/2018 BLDG DWF PARTIAL APPR <br /> 09-DRYWALL <br /> 8/9/2018 8/9/2018 BLDG TMB APPROVAL Elevator framing OK to cover <br /> 08-FRAMING <br /> 8/13/2018 8/13/2018 BLDG DWF APPROVAL 1st,2nd,3rd,4th floor elevator fronts <br /> 09-DRYWALL Approved as noted: <br /> Contractor to fill holes with mud around <br /> wiring holes.(Voids from fire protection). <br /> INSP12CRWs <br /> 'I'S TEM S <br />