Laserfiche WebLink
1/10/2020 Ci of Everett page 2' <br /> 11:47:07AM t3 <br /> INSPECTION ACTIVITY REPORT <br /> 9/20/2018 9/20/2018 BLDG DWF APPROVAL Framing-stairwells non-load bearing <br /> 08-FRAMING 4 floors. 1,2,3,4 <br /> and corridor wall to stairway. <br /> Note:Special inspection for all steel <br /> framework(structural)or engineer of record <br /> before cover. <br /> 9/28/2018 9/28/2018 BLDG DWF APPROVAL As noted Stairwell and corrido approved as noted. <br /> 09-DRYWALL Complete drywall on 2nd and hole in <br /> elevator front then OK to cover. <br /> 11/20/2018 11/20/2018 BLDG 12-CEILING KMK PARTIAL APPR OK to continue <br /> GRID <br /> 6/18/2019 6/18/2019 PERMIT CRB APPROVAL (6/18/2019 9:24 AM CRB) <br /> EXTENSION LACK OF EMPLOYEES/CRAIG <br /> SANDERSTON 425-508-0413 <br /> INSP12 CRWSYST I <br />