2828 COLBY AVE 2020-06-16
>
Address Records
>
COLBY AVE
>
2828
>
2828 COLBY AVE 2020-06-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2020 1:56:22 PM
Creation date
6/16/2020 1:53:52 PM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
2828
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c. Grid 2 between the Second and Third Floors. Detail 9/S1.3 appears to include <br /> partial support for the floor framing is provided by the wall. Sheet A1.2 shows <br /> the wall offset to the west of Grid 2, and does not align with the LVL framing on <br /> Grid 3 shown on Sheet S1.2. <br /> d. Grid A.5'/2.3'-2.6' from the foundation to the Third Floor. Note that a (2)2x6 <br /> beam appears to require support by the wall at the south end. <br /> 3. Continuing with the previous comment, structural calculations for the load-bearing studs <br /> do not appear to be provided and should be submitted for review. In addition to <br /> strength, the calculations should also verify that the potential differential shrinkage <br /> between the stud framing and the existing structure will not result in adverse effects on <br /> the framing and connections to the existing structural elements. Note that loads from <br /> the elevator hoist beam at the roof level should be concentrated on the studs directly <br /> supporting the beam unless framing is provided to further distribute the load. See IBC <br /> Sections 1604.2 and 2304.3.3. <br /> 4. Details 5/S1.2 and 6/S1.2 show post-installed anchors connecting the ledgers to the <br /> existing concrete walls. Documentation substantiating the design of the anchors should <br /> be submitted for review. See IBC Section 1901.2 and ACI 318-14 Chapter 17. <br /> 5. The Third Floor infill area west of Grid 3.1 is partially-supported by an existing steel <br /> beam per Sheet S1.3 and Detail 7/S1.3. Calculations substantiating the increased <br /> loading on the existing beam and the subsequent load path (e.g., beam connections, <br /> supporting beams and columns, etc.) should be submitted for review. See IBC Sections <br /> 1604.2 and 1604.4. <br /> 6. Wood joists frame into the existing column at Grid A'/2'. A detail of the connection <br /> should be submitted for review. See IEBC 106.2.1. <br /> 7. The section of the Structural General Notes titled "Elevators"on Sheet SO.1 indicates <br /> that the design of the structure to support elevator loads shall be provided in a deferred <br /> submittal. The following comments should be addressed: <br /> a. The elevator design drawings should be included in a list of deferred submittals <br /> in the Structural General Notes. See IBC Section 107.3.4.1. <br /> b. The building structure (i.e., elevator shaft and supporting floor framing) that <br /> supports components of the elevator system is included in the current submittal <br /> drawings. Calculations substantiating the design of the structure to support the <br /> elevator loads concurrently with other loads should be submitted for review. The <br /> calculations should include the evaluation of deflection limits per IBC Section <br /> 1607.9.1. See IBC Sections 1604.2 and 1605. <br /> c. The connections between the elevator guide rails and the structural framing are <br /> typically the responsibility of the engineer-of-record for the building system. At a <br /> minimum, connection details between the rail bracket and structural framing are <br /> required. Details for the elevator connections to the structural framing should be <br /> provided for review. The required locations and maximum spacing for the <br /> connection points should be identified in the structural drawings. See IBC <br /> Section 107.2.1 and 1604.4. <br /> CITY OF EVERETT • 3200 Cedar Street • Everett,WA 98201 • (425)257-8813 • Page 3/5 <br />