Laserfiche WebLink
Section 2.3 Asbestos Survey Narrative (Redi-Mix Building) <br /> South Everett CADMAN Plant( 6300 Glenwood Ave. I Everett, WA 98203 <br /> Bulk samples collected were submitted for sample analysis in accordance with method EPA-600/R-93/116: "Method for <br /> the Determination of Asbestos in Bulk Building Materials". Analyses were performed in Pacific Rim Environmental Inc.'s <br /> NVLAP Accredited Laboratory (Lab Code 101631-0). Materials are positive for asbestos if they are found to contain <br /> greater than 1%or 1%asbestos. <br /> A total of nine(9)samples were collected and submitted for PLM laboratory analysis. None(0)of these samples were <br /> found to contain asbestos. <br /> Thermal Systems insulation(TSI) <br /> No suspect asbestos-containing thermal systems insulation materials were identified at the subject property. <br /> If during the course of wall, ceiling or floor demolition, any TSI materials that are not listed in this report are uncovered, <br /> sampling be performed prior to disturbing these materials. <br /> Surfacing Materials <br /> Suspect asbestos-containing texture on GWB was identified throughout the interior walls of the north end of the <br /> structure.The materials were sampled and no asbestos was detected. (Samples#43, 44,45, 50, 51) <br /> If during the course of wall, ceiling or floor demolition,any surfacing materials not identified in this report are uncovered, <br /> sampling mug be performed prior to disturbing these materials. <br /> Miscellaneous Materials <br /> Suspect asbestos-containing sheet vinyl flooring was identified in the center area and in room#4. The materials were <br /> sampled and no asbestos was detected. (Samples#46, 49) <br /> Suspect asbestos-containing cove base mastic was identified on the perimeter walls of the north end of the structure. <br /> The material was sampled and no asbestos was detected. (Sample#47) <br /> Suspect asbestos-containing residual wall mastic was identified on the south wall of the north end of the structure.The <br /> material was sampled and no asbestos was detected. (Sample#48) <br /> if during the course of wall, ceiling or floor demolition, any miscellaneous materials that are not listed in this report are <br /> uncovered,sampling must be performed prior to disturbing these materials. <br /> PacRim#16467 Page 7 <br /> This report shall not be reproduced,except in full,without written permission from Pacific Rim Environmental,Inc. <br />