My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6300 GLENWOOD AVE 2020-06-17
>
Address Records
>
GLENWOOD AVE
>
6300
>
6300 GLENWOOD AVE 2020-06-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2020 8:27:08 AM
Creation date
6/17/2020 8:14:05 AM
Metadata
Fields
Template:
Address Document
Street Name
GLENWOOD AVE
Street Number
6300
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• The proposed project is not an essential public facility. <br /> The project proponent has agreed to comply with the SW Everett Subarea Plan Mitigation Decision Document. <br /> The project is hereby designated a Planned Action pursuant to RCW 43.21C.031(2)(a) and City of Everett <br /> Ordinance No.2213-97.A SEPA threshold determination is not required for this proposal per 43.21C.031 RCW. <br /> This determination is dependent upon compliance with the SW Everett Subarea Plan Mitigation Decision <br /> Document and all local, state, and federal regulations related to general environmental protection including, <br /> but not limited to, right-of-way improvement requirements, drainage, etc. This decision was made after review <br /> of a completed environmental checklist and other information on file with the lead agency. <br /> There is no public comment period provided for this determination. <br /> Responsible <br /> Official: Allan Giffen, Director Phone: (425) 257-8731 <br /> Title: Planning and Community Development Interim Responsible Official <br /> Address: 2930 Wetmore Avenue,Suite 8-A, Everett,WA 98201 <br /> Date: April 2,2019 <br /> Signature: <br /> :15Flv4t--ot(414 <br /> There is no administrative appeal provided for this determination. <br /> NOTE: This Planned Action Determination may be withdrawn in the event of significant changes in the <br /> proposal, disclosure of new significant information, misrepresentation by the applicant, or failure to comply <br /> with the existing regulations or the conditions in the Mitigation Decision Document. <br /> PLANNED ACTION DETERMINATION INFORMATION <br /> AGENCIES WITH JURISDICTION <br /> 1. A Construction Stormwater General Permit, administered by the Department of Ecology,will be required <br /> for this project if it will disturb an acre or more of land. Additional information as well as an application form <br /> can be found on the DOE website at: www.ecy.wa.gov/programs/wq/stormwater/construction. <br /> APPLICABLE CONDITIONS FROM SW EVERETT MITIGATION DECISION DOCUMENT: <br /> Section 3.5: AIR QUALITY AND ODOR <br /> 3.5.4 <br /> 3. Use dust suppression activities such as watering sites and washing construction vehicles prior to leaving the <br /> site. <br /> 4. Ensure that appropriate emission control devices are installed on all construction equipment. <br /> 11.11 Page 2 of 4 <br /> Project No.SEPI :-r 3 <br /> EVERETT <br />
The URL can be used to link to this page
Your browser does not support the video tag.