Asbestos Sample Summary 1 of 3
<br /> Lehigh Hanson Job Number 16467
<br /> 4 PaeRi m 6300 Glenwood Avenue Print Date: November 2, 2018
<br /> Everett,WA
<br /> ''rolect South Everett CADMAN Plant
<br /> 6300 Glenwood Avenue
<br /> Everett,WA
<br /> Sample# Sample Date Sample Location AHERA Category Sample Description Asbestos Type 1% Approximate Quant.
<br /> 01 10/20/2018 Batch tower, 2nd floor,east end Miscellaneous ._. ,aulking y,u,:ia:; 17 Each
<br /> 02 10/20/2018 Batch tower,2nd floor,east end on dividing Miscellaneous Sheetrock(GWB) None Detected(Both Layers) N/A
<br /> wall
<br /> 03 10/20/2018 Batch tower,2nd floor,east end Miscellaneous 12x12 Flooring tile with associated None Detected(Both Layers) N/A
<br /> black mastic
<br /> 04 10/20/2018 Batch tower,2nd floor,east end on Surfacing Textured coatings Chrysotile 1-3%. 600 S.F.
<br /> concrete perimeter walls
<br /> Batch tower, 2nd floor,east end,above
<br /> 05 10/20/2018 Surfacing Popcorn Ceiling Texture Chrysotile 1-3%. 800 S.F.
<br /> drop ceiling
<br /> 06 10/20/2018 Batch tower, 2nd floor,east end Miscellaneous 2x4 Ceiling tile None Detected. N/A
<br /> Layer 1 (Mastic):None Detected.
<br /> 07 10/20/2018 Batch tower, 2nd floor, east wall Miscellaneous -eve Base Mastic 40 L.F.
<br /> 08 10/20/2018 Batch tower,2nd floor,center area Miscellaneous 2x4 Ceiling tile None Detected. N/A
<br /> 09 10/20/2018 Batch tower,2nd floor,center area Miscellaneous 12x12 Flooring tile with associated None Detected(Both Layers) N/A
<br /> black mastic
<br /> 10 10/20/2018 Batch tower, 2nd floor,center area, :u Surfacing Textured coatings Chrysotile 1-3%. 800 S.F.
<br /> perimeter wall
<br /> 11 10/20/2018 Batch tower,2nd floor,center area,west Miscellaneous Sheetrock(GWB) None Detected. N/A
<br /> dividing wall
<br /> 12 10/20/2018 Batch tower, 2nd floor,center area, Miscellaneous 12x12 Flooring tile with associated None Detected (All Layers) N/A
<br /> underneath carpeting black mastic
<br /> 13 10/20/2018 Batch tower, 2nd floor,center area,south Miscellaneous •Nindow caulking Chrysotile 3-5% See Sample#1
<br /> wall
<br /> 14 10/20/2018 Batch tower, 2nd floor,west area Surfacing Textured coatings Chrysotile 1-3% 800 S.F.
<br /> 15 10/20/2018 Batch tower, 2nd floor,west area on Surfacing Popcorn Ceiling Texture Chrysotile 3-5% See Sample#5
<br /> support beam
<br /> 16 10/20/2018 Batch tower,2nd floor,west area Surfacing Popcorn Ceiling Texture Chrysotile 1-3% See Sample#5
<br /> 17 10/20/2018 Batch tower,2nd floor, west an,.on Miscellaneous dove Base Mastic Layer 1 (Mastic):None Detected. 40 L.F.
<br /> perimeter wall Layer 2(Texture):Chrysotile 1-3%.
<br /> 18 10/20/2018 Batch tower, 2nd floor, west wall betweenMiscellaneous xpansion Joint Chrysotile 1-3%. 50 L.F.
<br /> wall and column
<br /> Layer 1 (Caulk):None Detected.
<br /> 19 10/20/2018 Batch tower, 2nd floor,west entryway Miscellaneous oor Frame Caulk Layer 2(Texture):Chrysotile 1-3% 24 L.F.
<br /> Layer 3(Substrate):None Detected.