Laserfiche WebLink
Brian and Connie Hallgarth JN 18517 <br /> November 15, 2018 age 5 <br /> we actually observe. It is still the responsibility of your contractor or on-site construction team to <br /> verify that our recommendations are being followed, whether we are present at the site or not. <br /> If you have any questions regarding this report, or if we can be of further service, please do not <br /> hesitate to contact us. <br /> Respectfully submitted, <br /> • <br /> GEOTECH CONSULTANTS, INC. <br /> IgG R McC, <br /> 4. <br /> o a <br /> SiaNA LL B116 '�i <br /> Marc R. McGinnis, P.E. <br /> Principal <br /> cc: Designs NW Architects—Tom Rochon <br /> via email: tom(adesignsnw.com <br /> MRM: kg <br /> GEOTECH CONSULTANTS,INC. <br />