My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
330 HEATHER RD 2020-06-17
>
Address Records
>
HEATHER RD
>
330
>
330 HEATHER RD 2020-06-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2020 8:53:36 AM
Creation date
6/17/2020 8:53:12 AM
Metadata
Fields
Template:
Address Document
Street Name
HEATHER RD
Street Number
330
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10/31/2019 p ge 1 <br /> City of Everett <br /> 8:50:08AM <br /> A INSPECTION ACTIVITY REPORT <br /> Permit No. C1811-007 Site Address 330 HEATHER RD <br /> Applied 11/27/2018 Applicant ROCHON TOM Lot <br /> Approved 3/12/2019 Owner HALLGARTH CONSTANCE A&BRIAN H Block <br /> Issued 3/14/2019 Contractor OWNER Tract <br /> Parent Permit No. Description INTERIOR REMODEL/290 SF ADDN ON WEST SIDE OF HOU; <br /> Notes REPLACE ALUM FRAME WINDOWS <br /> (12/3/2018 1:25 PM TRN) <br /> PERMIT CONDITIONS: 1.Downspouts shall discharge to splash blocks.2.Erosion control measures <br /> shall be installed.3.No dirt,etc.to be tracked onto roadway. <br /> Scheduled Completed Type Inspector Result Remarks Inspector's Comments <br /> 4/12/2019 4/12/2019 BLDG KMK APPROVAL 206-617-6228 Steve <br /> 02-FOOTING/SETB AM Inspection requested <br /> 4/12/2019 4/12/2019 BLDG KMK APPROVAL <br /> 03-FOUNDATION <br /> 4/17/2019 4/17/2019 PLUMB SDP APPROVAL As noted MORNING IF POSSIBLE. 425-876-0070 <br /> 03-ROUGH IN <br /> (4/17/2019 1:52 PM SDP) <br /> Recall for the vents going through the roof, <br /> waiting for the roof work to be completed. <br /> 4/18/2019 4/18/2019 BLDG DWF APPROVAL (4/18/2019 1:28 PM DWF) <br /> 08-FRAMING Under floor framing,ok to cover. <br /> (4/18/2019 1:29 PM DWF) <br /> Underfloor framer ok to cover. <br /> 4/19/2019 4/19/2019 BLDG KMK APPROVAL done on 4/18 Phone:206-617-6228 <br /> 05-UNDERFLOOR <br /> 5/3/2019 5/3/2019 BLDG KMK APPROVAL (5/3/2019 1:23 PM KMK) <br /> 07-EXTERIOR KMK changed Inspection Type from BLDG <br /> 10-INTERIOR SHEAR to BLDG <br /> 07-EXTERIOR SHEAR <br /> (5/3/2019 1:29 PM KMK) <br /> As noted: <br /> Complete field nailing per plan as <br /> discussed. <br /> 5/7/2019 5/7/2019 PLUMB DXW APPROVAL Bryan 425-299-0116 <br /> 03-ROUGH IN <br /> (5/7/2019 2:01 PM DXW) <br /> Plbg.vents through roof R.I.ok. <br /> 5/16/2019 5/16/2019 BLDG KMK OTHER (5/15/2019 3:35 PM KMK) <br /> 01-CONSULTATIO kmk changed Inspection Date/Time from <br /> 05/15/2019 to 05/16/2019 <br /> (5/16/2019 8:38 AM KMK) <br /> Ok to rebuild existing stairs to 2012 <br /> international fire code 1104.10 <br /> 5/29/2019 5/29/2019 GAS 01-ROUGH IN SDP PARTIAL APPR (5/28/2019 2:34 PM TAH) <br /> BRIAN 425-299-0116 <br /> (5/29/2019 3:14 PM SDP) <br /> Methods and materials are ok.I will need to <br /> see a pressure test for the gas piping. <br /> INSP12 CRWS YS TEM S <br />
The URL can be used to link to this page
Your browser does not support the video tag.