Laserfiche WebLink
10/31/2019 Page 2 <br /> City of Everett <br /> 8:50:08AM /f <br /> INSPECTION ACTIVITY REPORT .c2) <br /> 5/2h/2019 5/29/2019 MECH 04-ROUGH SDP PARTIAL APPR (5/28/2019 2:34 PM TAH) <br /> IN BRIAN 425-29-0116 <br /> (5/29/2019 3:13 PM SDP) <br /> Recall for the stove exhaust. <br /> Dryer exhaust will be on outside wall ok to <br /> wait until final inspection. <br /> (5/29/2019 3:16 PM SDP) <br /> Final Notes: The b-vent in the basement <br /> must be graded upwards 1/4"per foot. <br /> 6/4/2019 6/4/2019 GAS 01-ROUGH IN SDP APPROVAL 15#test Phone:206-391-1376 <br /> 6/4/2019 6/4/2019 MECH 04-ROUGH SDP PARTIAL APPR (6/4/2019 3:23 PM SDP) <br /> IN 1)ok to proceed with framing <br /> 2)Recall for fireplace and stove exhaust. <br /> 6/5/2019 6/5/2019 BLDG DWF APPROVAL interior hold downs installed.Ok to cover. <br /> 08-FRAMING <br /> 6/11/2019 6/11/2019 BLDG DWF APPROVAL Note: need a mechanical inspection for the <br /> 11-INSULATION duct in attic before drywall ceiling. <br /> Need to have interior shearnailing <br /> inspection before drywall nailing <br /> 6/13/2019 6/13/2019 MECH 04-ROUGH RRS PARTIAL APPR (6/13/2019 2:13 PM RRS) <br /> IN B vent exhaust grade corrected,stove <br /> exhaust approved.Note:fireplace is not <br /> being installed at this time due to lack of <br /> funding by the owner. <br /> 6/18/2019 6/18/2019 BLDG DWF PARTIAL APPR interior shear,partial appproval,rooms ok <br /> 10-INTERIOR to cover. <br /> Note garage walls SW5-verify that 10d <br /> nails have been installed as per plans before <br /> cover <br /> 6/21/2019 6/21/2019 BLDG DWF APPROVAL Framing ok and Shear wall interior for <br /> 08-FRAMING garage completed. <br /> 6/27/2019 6/27/2019 BLDG DWF APPROVAL <br /> 09-DRYWALL <br /> 8/23/2019 8/23/2019 MECH 04-ROUGH RRS PARTIAL APPR see notes 425-299-0116 <br /> IN <br /> (8/23/2019 3:36 PM RRS) <br /> dryer exhaust not roughed in,need to call <br /> for gas piping inspection into fireplace. <br /> fireplace exhaust meet mfg specs.owner <br /> will call mfg as to hearth clearance in front <br /> of fireplace. <br /> 9/4/2019 9/4/2019 BLDG 14-OTHER DWF OTHER 425-299-0116 <br /> (9/4/2019 1:10 PM DWF) <br /> Consultation for building final <br /> 9/5/2019 9/5/2019 MECH 04-ROUGH SDP APPROVAL Brian 425-299-0116 <br /> IN <br /> (9/5/2019 2:22 PM SDP) <br /> Gas piping to fireplace complete <br /> Fireplace clearances are ok <br /> 10/29/2019 10/29/2019 MECH 06-FINAL SDP APPROVAL Brian 425-299-0116 <br /> 10/29/2019 10/29/2019 PLUMB 06-FINAL SDP APPROVAL <br /> 10/29/2019 10/29/2019 GAS 03-FINAL SDP APPROVAL <br /> 10/30/2019 10/30/2019 BLDG 15-FINAL DWF APPRVD-PERIv Brian:425-299-0116 <br /> 10/30/2019 10/30/2019 ADMIN USE KLC APPROVAL <br /> ONLY** <br /> INSP12 CRVVSYSTEMS <br />