My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015/03/18 Council Agenda Packet
>
Council Agenda Packets
>
2015
>
2015/03/18 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2020 12:08:55 PM
Creation date
6/17/2020 12:05:12 PM
Metadata
Fields
Template:
Council Agenda Packet
Date
3/18/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
must (1) include the entire month of the Maximum Month Flow as identified by Everett within <br /> the five month period of November through March, (2) be performed with equipment and <br /> devices suitable and appropriate for the measurement of flows at the Connection Points, and (3) <br /> be performed by a qualified party. The District shall promptly provide to Everett the written <br /> results of the flow monitoring study. This Section C does not restrict Everett from undertaking <br /> other flow monitoring studies in addition to the District's flow monitoring studies. If the location <br /> has access to telemetry,both Parties shall have the right to establish a connection to the signal. <br /> 4. DISTRICT CAPACITY RIGHTS <br /> A. Grant of District Capacity Rights <br /> Subject to the terms of this Agreement, Everett grants the following capacity <br /> rights ("District Capacity Rights") to District in the following Everett sewer facilities ("Everett <br /> Capacity Facilities")as shown on Exhibit B and Exhibit C attached to this Agreement: <br /> Segment Everett Capacity Facility District Capacity Right <br /> A South End Interceptor Extension from SMH 2085Y06 to 831 gpm <br /> SMH 2085Z08 <br /> B South End Interceptor Extension from SMH 2085Z08 to 5,400 gpm <br /> SMH 2085Z07 <br /> C South End Interceptor Extension from SMH 2085Z07 to 11,500 gpm <br /> South End Interceptor South Segment SMH 0885J02 <br /> (Shadow Wood Screen) <br /> D South End Interceptor South Segment from SMH 11,500 gpm <br /> 0885Z02 (Shadow Wood Screen)to South End <br /> Interceptor North Segment(upstream end of SML <br /> 0585C0A) <br /> E South End Interceptor North Segment(upstream end of 11,500 gpm <br /> SML 0585C0A)to EWPCF's Headworks <br /> F Headworks at EWPCF 11,500 gpm <br /> G Sewage Treatment Plant(Everett Water Pollution Control 6.6 MGD <br /> Facility-EWPCF) <br /> The District Capacity Rights listed in"gpm"are determined as the maximum 60-minute volume <br /> in gallons averaged over 60 minutes. The District Capacity Rights listed in"MGD" are <br /> determined as maximum average wet month(30 consecutive days) flow. <br /> The"segment" designation is only for clarity and is shown in attached Exhibit C. <br /> 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.