My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3323 HOYT AVE C D 2020-06-17
>
Address Records
>
HOYT AVE
>
3323
>
3323 HOYT AVE C D 2020-06-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2020 1:18:37 PM
Creation date
6/17/2020 1:17:48 PM
Metadata
Fields
Template:
Address Document
Street Name
HOYT AVE
Street Number
3323
Unit
C D
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Brad Rzechula <br /> Leading Edge Construction, LLC <br /> Plan Check Number: B1803-029, First Review <br /> May 4, 2018 <br /> design to resist the governing design lateral forces per ASCE 7-10. At the EOR's option, a <br /> proprietary system may used in the design; an ESR shall be submitted to substantiate the <br /> design. The documentation shall establish the response modification factor appropriate to the <br /> system per Section 12.2.1; themost stringent value shall be used for the entire building per <br /> Section 12.2.3.1. See IBC Sections 1604.1, 1604.4, 1609.1, and 1613.1. <br /> 25. Continuing with the previous comment, the portal frame beams support both gravity and <br /> seismic loads. Calculations substantiating the design of the beams shall be submitted for <br /> review. The seismic loads shall include holdown forces at Grids A.5/1.5 and A.5/4.5 from the <br /> second story shearwalls. The holdown forces shall include overstrength per ASCE 7-10 Section <br /> 12.3.3.3. The design shall include the seismic load combinations per Section 12.4.3.2. See <br /> IBC Sections 1604.1, 1604.4, and 1613.1. <br /> 26.The wood shear walls appear to be missing holdowns at the ends of multiple walls on Sheets <br /> S-4.0, S-5.0, and S-6.0. Holdowns shall be provided connecting the boundary elements (i.e., <br /> studs at the wall ends) across floor framing and to the foundation at all wall ends. Calculations <br /> substantiating the design of the holdowns and boundary elements should be submitted for <br /> review. See IBC Sections 1604.1, 1604.8.1, 1604.10, 2304.10.6, and 2306.1, and NDS-15 <br /> SDPWS Sections 3.4, 4.1.4, and 4.3.6.4.2. <br /> 27. Holdowns connecting to the concrete foundation shall comply with the load requirements of <br /> ACI 318-14 Section 17.2.3.4. The design does not appear to consider this criteria. <br /> Calculations substantiating the holdown design including this criteria shall be submitted for <br /> review. IBC Section 1901.2. <br /> 28.The shear walls on Grid 3 are discontinuous to the foundation, resulting in a Type 4 Horizontal <br /> Structural Irregularity per ASCE 7-10 Table 12.3-1. The first-story wood posts, wall-to-post <br /> connections, wall-to-beam connections, beam-to-post connections, post-to-foundation <br /> connections, and foundations on Grid 3/C-E shall be designed considering the over-strength <br /> factor per Section 12.3.3.3. The design shall include the seismic load combinations per Section <br /> 12.4.3.2. The design shall provide a complete load path to the foundation. See IBC Sections <br /> 1604.2, 1604.4, and 1613.1. <br /> 29.The shear walls on Grid A.1 are discontinuous to the foundation, resulting in a Type 4 <br /> Horizontal Structural Irregularity per ASCE 7-10 Table 12.3-1. Furthermore, the walls are not <br /> consistent between the second and third stories per the plans on Sheets S-5.0 and S-6.0. All <br /> structural elements supporting the discontinuous walls at both levels shall be designed <br /> considering the over-strength factor per Section 12.3.3.3. Structural elements required to <br /> meet this loading criteria include but are not limited to: beams including bearing and <br /> mechanical shear connections, columns and posts, foundations, and connections between <br /> elements including those resisting uplift. Note that the connections per Detail 1/S-4.0 do not <br /> appear structural adequate to transfer the required uplift forces. The design shall include the <br /> seismic load combinations per Section 12.4.3.2. The design shall provide a complete load path <br /> to the foundation. See IBC Sections 1604.2, 1604.4, and 1613.1. <br /> Pa e7of <br /> CITY OF EVERETT• 3200 Cedar Street • Everett, WA 98201 • (425) 257-8810 • Fax(425) 257-8857 <br />
The URL can be used to link to this page
Your browser does not support the video tag.