Laserfiche WebLink
• <br /> 3.1.6 Preparation of Construction Stormwater Pollution Prevention Plan(SWPPP),Vol 1, <br /> Section 3.1.6 <br /> A completed Construction Stormwater Pollution Prevention Plan is included in this report. <br /> 3.1.7 Completion of Stormwater Site Plan,Vol. 1, Section 3.1.7 <br /> A Permanent Stormwater Site Plan prepared by Donna Breske&Associates is included in this <br /> submittal. <br /> 2.5.2 Minimum Requirement#2: Construction Stormwater Pollution Prevention(SWPP) <br /> A completed Construction Stormwater Pollution Prevention Plan is included in this report. <br /> 2.5.3 Minimum Requirement#3: Source Control of Pollution <br /> Best Managed Practices(BMPs)from Volume IV will be implemented to their greatest extent <br /> feasible to control the source of pollution and will be shown on the site plans. <br /> 2.5.4 Minimum Requirement#4: Preservation of Natural Drainage Systems and Outfalls <br /> Existing upstream patterns are not anticipated to change as a result of the proposed development <br /> site. <br /> 2.5.5 Minimum Requirement#5: On Site Stormwater Management <br /> Due to a lack of available space on-site stormwater management is determined to be infeasible <br /> for this project. All stormwater runoff from the proposed impervious surfaces is proposed to be <br /> routed to the existing sewer system. <br /> • Lawn and Landscaped Areas: N/A J i101 & dr G fi/ Conilec '/ <br /> • Roofs: 1,763 sf -MC S ✓ek"S rk/+'1 )19Qi1 <br /> • Other Hard Surfaces: 1,330 sf Rot/ <br />