My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10901 27TH AVE SE 2020-06-18
>
Address Records
>
27TH AVE SE
>
10901
>
10901 27TH AVE SE 2020-06-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2020 8:27:22 AM
Creation date
6/18/2020 8:21:39 AM
Metadata
Fields
Template:
Address Document
Street Name
27TH AVE SE
Street Number
10901
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PANEL SCHEDULE:10/24/2017 PANEL 'PORT' PROJECT:JAMES MONROE PORTABLES <br /> CLASSIFICATION:NORMAL VOLTAGE:208Y/120V 30,4-WIRE SECTION:1 OF 1 <br /> FED FROM: MAINS:800A MAIN CIRCUIT BREAKER <br /> MOUNTING:SURFACE NEUTRAL:100%RATED AIC:35,000 <br /> CKT BREAKER LOAD LOAD BREAKER CKT <br /> NOTE ITEM DESCRIPTION NO. AMPS POLE (VA) 0 (VA) AMPS POLE NO. ITEM DESCRIPTION NOTE <br /> 1 (E)PANEL'PORT1' 1 200 2 9180 A 7248 200 2 2 (E)PANEL'PORT2' <br /> 3 - - 9440 B 7248 - - 4 - <br /> SPARE 5 250 2 C 9784 200 2 6 (E)PANEL'PORT3' <br /> 7 - - A 9964 - 8 - <br /> SPARE 9 250 2 B 300 2 10 SPARE <br /> 11 - - C - - 12 - <br /> SPACE 13 20 1 A 20 1 14 SPACE <br /> SPACE 15 20 1 B 20 1 16 SPACE <br /> SPACE 17 20 1 C 800 20 1 18 HOFFMAN ENCLOSURE RECEPTACLE <br /> SPACE 19 20 1 A 1680 20 1 20 HOFFMAN ENCLOSURE COOLING UNIT <br /> LOAD CALCULATIONS <br /> LOAD DESCRIPTION CONN.(VA) DEMAND FACTOR CALC.(VA) <br /> MISCELLANEOUS CONTINUOUS: - 125% - LOAD SUMMARY <br /> EQUIPMENT&MISCELLANEOUS: 14516 100% 14516 <br /> LIGHTING: 4376 125% 5470 TOTAL <br /> LARGEST MOTOR: 1680 125% 2100 CONNECTED LOAD AMPS <br /> MOTORS: - 100% - PHASE A: 28,072 VA 234 A <br /> RECEPTACLE: 7892 100% 7892 <br /> RECEPTACLES OVER 10kVA: - 50% - PHASE B: 16,688 VA 139 A <br /> ELECTRIC HEATING: 26880 100% 26880 <br /> PHASE C: 10,584 VA 88 A <br /> TOTAL CALCULATED LOAD: 56,858 VA <br /> TOTAL CALCULATED AMPS: 158 A <br /> TOTALS: 55,344 56,858 <br /> NOTES: HARGIS ENGINEERS,INC. <br /> 1. CONNECT TO EXISTING SPARE BREAKER 1201 THIRD AVENUE, SUITE 600 <br /> 2. SEATTLE,WA 98101 <br /> 3. <br /> 4. PH.(206)448-3376 <br /> 5. FAX.(206)448-4450 <br />
The URL can be used to link to this page
Your browser does not support the video tag.