My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1632 46TH ST SE 2020-06-18
>
Address Records
>
46TH ST SE
>
1632
>
1632 46TH ST SE 2020-06-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2020 12:06:57 PM
Creation date
6/18/2020 12:01:48 PM
Metadata
Fields
Template:
Address Document
Street Name
46TH ST SE
Street Number
1632
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Central Park SFR-CAR&Mitigation Plan <br /> • Substitute species that are more suited to local conditions for species that had high <br /> mortality(>80%) <br /> • Irrigate at regular intervals during the growing season to reduce transplant stress <br /> • Promote optimum growth by removing competing vegetation in plant pits <br /> • Replant with stock that propagates quickly <br /> Goal 2: Preserve and protect critical areas on the subject property. <br /> Objective 1: Fence and sign the boundary of onsite critical areas as required by EMC <br /> 1937.110(E). <br /> Performance Standard: <br /> • Fencing and signs are installed according to EMC 19.37.110(E). <br /> Evaluation Method: Review and approval by the project biologist. <br /> Contingency: <br /> • Replace or install fence and/or signs as necessary <br /> 6.0 Monitoring <br /> 6.1 General <br /> The monitoring period for this mitigation project will last for five years. After the completion of the <br /> Time Zero/As-built Report and subsequent approval,the bond anniversary date will be set and the <br /> monitoring period shall begin. The mitigation sites will be monitored using standardized techniques and <br /> procedures described below for vegetation survival,vigor and growth of plant material,and the success <br /> of the mitigation plan overall. The monitoring strategy will include the following elements unless <br /> otherwise approved by City staff. <br /> 7.0 Monitoring Schedule <br /> An annual report describing and quantifying the level of success of the plan will be written and <br /> submitted to the City of Everett for review and approval. The monitoring strategy will consider, but is <br /> not limited to: <br /> a) Plant species composition and cover values for vegetation in the planting areas <br /> b) Survival rate of originally planted vegetation <br /> c) Wildlife use <br /> d) Indications of human disturbance <br /> 7.1 Time-Zero Report: <br /> A Time Zero/As-built Report will be completed by the contractor and the consulting biologist when <br /> planting is finished.The Time-Zero Report will identify problems in obtaining materials,differences in <br /> ,::,_.: fff to Mgt, I! F. <br /> rple_t by.t.'r!ldra:i';np.i!icint• I!it. <br />
The URL can be used to link to this page
Your browser does not support the video tag.