Laserfiche WebLink
2. Reference to detail 20/A7 typical stairs added to interior stairs on A5, and <br /> exterior stairs as applicable, on A4. <br /> 3. Min 24" sill indicated/clouded for 6 windows on front and rear elevations <br /> and on floor plans —Al, A4, A5 <br /> 4. Exterier stair light added/clouded on A4 back deck. <br /> Energy: <br /> 1. Floor insulation R-38 indicated/clouded in section A/A7 typ 2 Story Section. <br /> 2. Seismic straps and R-10 base indicated/clouded for Elec HW Tank on A4. <br /> Structural: <br /> 1. Schedule of Inspections added to Sheet Al. <br /> 2. Typical Canted Fnd Wall detail 7/A3 was provided by the structural <br /> engineer. Back up calculations will be provided by them. <br /> 3. The slab indicated on Detail 7/A3 has been replaced with min backfill <br /> requirement—clouded on 7/A3. There are no slabs in the crawl. <br /> 4. There are actually no RSWs in this project. All references to RSW in the <br /> plans, details, and schedules have been removed. This was a carry over <br /> from early design. The latest Later calcs from structural engineer markup <br /> plans do not indicate any RSWs as being required. A RSW detail was <br /> included and called out as an oversight. Refer to original plan markups from <br /> Structural Engineering. <br /> 5. Refer to Structural Engineer <br /> 6. Detail 15/A6 call out corrected/clouded on A4 <br /> 7. Refer to Structural Engineer <br /> 8. Floor/ sheathing nailing shall be specified only in Structural <br /> schedules/notes on A8. Reference to A8 made on A9 and clouded ILO <br /> specifications. <br /> 9. Design of trusses will be provided by Truss supplier — drawings furnish at <br /> inspection. Loads supplied by Structural Engineer if required. <br /> 10.Reference to Lumber grades on A9 removed/replaced by reference to A8, <br /> and clouded. <br /> Thank you <br /> Doug Williams — Designer—425 530-1042 — dougwilliams444@gmail.com <br /> .- Jf <br />