My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2108 74TH ST SE 2020-06-19
>
Address Records
>
74TH ST SE
>
2108
>
2108 74TH ST SE 2020-06-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2020 8:55:28 AM
Creation date
6/19/2020 8:52:23 AM
Metadata
Fields
Template:
Address Document
Street Name
74TH ST SE
Street Number
2108
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PA <br /> � , t , r4\- l SCP . <br /> 5. Provide buildi g section at re addition. Show all components including floc-joists and the <br /> connection to •- - g structure, stud siz(and spacing, header site a d R-1&'rigid <br /> insulation at headers, top and bottom plates, blocking between rafters, ' sulation baffle <br /> and ceiling joist size and spacin� l i=t7 7i L <br /> 6. Specify the type of insulation used to achieve minimum R-30 in a 8 cavity. <br /> 7. R602.9 Cripple walls. Foundation cripple walls shall be fram:• of studs not smaller than <br /> the studding above. <br /> 8. Footings shall rest on undisturbed soil not less than 18" below the finished grade. Show <br /> how new fo_ <br /> footings/foundation is attached to the Pxistinq_fo�,ndation. /7o - LJ <br /> 9. Show how existing crawl space is provided with ventilation and access. <br /> —� . OiL?5P50�?121 <br /> 10. Show location of the electrical panel on the floor plan. L1� <br /> (6'11 0q5) <br /> 11. Show how dwelling is provided with heat per section R303 IRC. <br /> If you have any questions, please email or call me at (425) 257-8976. Upon submittal of the <br /> drawings, your application will be given priority and plan reviews will recommence. All required <br /> submittals shall be sufficient detail and contain sufficient information to ensure that the proposed <br /> structure will be constructed in compliance with all adopted codes. <br /> Please prepare a response letter showing where each item in this correction <br /> letter is addressed on the plan set. <br /> Sincerely, <br /> ..- Xt.-- <br /> Jeff Heilman <br /> Development Technician <br /> City of Everett Public Works Department <br /> 3200 Cedar St, Everett, WA 98201 <br /> Office: 425-257-8810 I Direct: 425-257-8976 <br /> Email: JHe//mannaeverettwa.gov <br /> 74 RIDLIC WOR/CS <br /> The Permit Services Counter is located on the 2nd Floor. <br /> Hours of Operation: Monday-Friday 7:30am -12:00pm and 1:OOpm-4:OOpm. <br /> All emails, and attachments, sent to and from City of Everett are Public <br /> Records and may be subject to public disclosure pursuant to RCW 4256. <br /> Page 2of2 <br /> CITY OF EVERETT • 3200 Cedar Street • Everett, WA 98201 • (425) 257-8810 • Fax (425) 257-:: <br />
The URL can be used to link to this page
Your browser does not support the video tag.