My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1415 75TH ST SW BASE FILE 2020-06-19
>
Address Records
>
75TH ST SW
>
1415
>
BASE FILE
>
1415 75TH ST SW BASE FILE 2020-06-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2020 9:15:15 AM
Creation date
6/19/2020 9:14:13 AM
Metadata
Fields
Template:
Address Document
Street Name
75TH ST SW
Street Number
1415
Tenant Name
BASE FILE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task Item: <br /> Task 1 —Mobilization and Site Preparation <br /> Item 1.1: Mobilization and General Services <br /> AIS has included mobilization and General Services such as preparatory work and <br /> operations necessary for the movement of personnel, equipment, supplies, and incidentals <br /> to the Site,the establishment of temporary facilities and controls necessary for the Work; <br /> premobilization work; insurance; project management; AIS's Submittals; dust and odor <br /> controls during implementation of the work; and all other incidental work items not <br /> specifically attributable to other SOW items listed herein. <br /> Item 1.2: Permitting <br /> AIS will obtain all permits and filing all regulatory notifications necessary for <br /> performance of the Work. Work will be completed in accordance with site-specific <br /> regulatory permits and associated requirements. The work shall be completed to the <br /> satisfaction of the City permits (as applicable)Engineer and the Owner. <br /> Item 1.3: Site Preparation <br /> Site Preparation includes, but is not limited to, subsurface and aboveground utility <br /> location and clearance; and general Site cleanup and sweeping after each work shift. Site <br /> Preparation will also include temporary utility terminations (Lock Out Tag Out) <br /> "LOTO", as needed for safe implementation of the work. The subsurface clearance (SSC) <br /> will be completed by a subcontractor to AIS. <br /> Task 2—Demolition <br /> Items 2.1 and 2.2: Concrete Slab Demolition <br /> AIS will demolish and remove all concrete slab required for access to the soil below. <br /> Work will include cutting, breaking, collection and removal of demolition debris from <br /> building interior for subsequent offsite disposal. Slab areas are as follows: (1) 20'x30', <br /> (1) 12'x12' and (1) 20'x20'. Existing slab on grade is 5 '/2" with 6"x6" Welded Wire <br /> Mesh. <br /> Item 2.3: Protection of Adjacent Structures <br /> Protection will be provided for adjacent structures, load-bearing walls and columns. <br /> There are no areas within work that will undermine or come within 10' of existing <br /> columns or footings. AIS will utilize Slide Rail shoring for any excavations anticipated <br /> over 5'. Currently this is only for the 20' x 30' area that will go up to 10' BGS. <br /> Item 2.4: Loading and Transportation of Removed Concrete for Disposal/Recycling <br /> The Loading and Transportation of Removed Concrete for Disposal/Recycling includes <br /> work associated with handling, loading, transportation, and offsite disposal/recycling of <br /> all concrete debris and other construction and demolition (C&D) debris generated during <br /> performance of the work. Concrete will be recycled at CEMX facility located at 6300 <br /> Glenwood Ave, Everett, WA <br /> 1502 E.Opp Street,Wilmington,CA,90744 //17) <br /> Office(310)522-1168 Fax(310)522-0474 <br />
The URL can be used to link to this page
Your browser does not support the video tag.