My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020/06/24 Council Agenda Packet
>
Council Agenda Packets
>
2020
>
2020/06/24 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2020 11:54:57 AM
Creation date
6/29/2020 11:52:23 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
6/24/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
b <br /> EVERETT <br /> ptlt 3200 Cedar Street, <br /> Everett WA 98201 <br /> PUBLIC WORKS (425) 257-8800 <br /> BID SUMMARY <br /> Project Name: 2020 WPCF Trickling Filter Media Replacement <br /> W.O.# UP 3742-2 <br /> Date 6/2/2020 <br /> For:John Nottingham, Project Engineer <br /> Bidder Name: Bidder Totals: <br /> ENGINEER'S ESTIMATE $1,314,855.00 <br /> Stellar) Coproration $1,093,059.00 <br /> McClure and Sons, Inc $1,114,720.34 <br /> Pacific Crest Construction, Inc $1,196,820.00 <br /> IMCO General Construction, Inc $1,359,873.00 <br /> Razz Construction, Inc $1,535,004.00 <br /> 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.