Laserfiche WebLink
2/14/2020 City of Everett Page 2/3 <br /> 1:16:28P14 <br /> INSPECTION ACTIVITY REPORT <br /> 5/14/2019 5/14/2019 PLUMB DXW APPROVAL 2nd-phase unit-B Access through side gate on north side <br /> 02-GROUND Phone:425-293-5005 <br /> 5/28/2019 5/28/2019 BLDG DWF PARTIAL APPR Ok,to insulate slab on grade. <br /> 06-UNDERSLAB 2"of rigid foam insulation with vapor <br /> barrier installed. <br /> 6/27/2019 6/27/2019 PLUMB DXW APPROVAL 425-293-5005 John <br /> 03-ROUGH IN <br /> (6/27/2019 12:54 PM DXW) <br /> R.I.plbg.ok unit B phase 2. <br /> funnel drain for hot water tank inspector <br /> will check at final insp. <br /> 7/3/2019 7/3/2019 BLDG TMB CORRECTION Partial Approval 425-293-5235 <br /> 08-FRAMING Unit"B"North apt <br /> unit (7/3/2019 1:34 PM TMB) <br /> Complete the installation of all ventilation <br /> fan ducting. <br /> Complete attic venting and insulation <br /> baffles at eves. <br /> Provide firestops at stair stringers or fully <br /> insulate the wall cavity. <br /> Ok to insulate walls. <br /> Recall framing and insulation inspections <br /> when completed. <br /> 7/8/2019 7/8/2019 BLDG DWF CORRECTION AM inspection requested <br /> 11-INSULATION Phone:425-293-5005 <br /> (7/8/2019 2:21 PM DWF) <br /> Framing,need additional mechanical work <br /> RI sign off. <br /> Install positive connection post/beams. <br /> Install A-35's to stair stringers for positive <br /> connection <br /> Install H-clips to truss rafters. <br /> 7/9/2019 7/9/2019 MECH 04-ROUGH TMB PARTIAL APPR see notes 425-293-5005 Jon <br /> IN <br /> (7/9/2019 3:15 PM TMB) <br /> Complete duct installation details in attic. <br /> As discussed today on site. <br /> Insulate ducts and provide smooth ridgid <br /> dryer duct. <br /> Will check at final inspection. <br /> 7/9/2019 7/9/2019 BLDG TMB NOT READY not ready 425-293-5005 Jon <br /> 09-DRYWALL <br /> 7/9/2019 7/9/2019 BLDG BDGI APPROVAL <br /> 11-INSULATION <br /> 7/9/2019 7/9/2019 BLDG BDGI APPROVAL <br /> 08-FRAMING <br /> 10/28/2019 10/28/2019 MECH 06-FINAL DXW CORRECTION (10/28/2019 3:41 PM SDP) <br /> Unit B: <br /> 1)no flex duct on the stove exhaust,6" <br /> min. <br /> 2)Anti-tip on stove is required <br /> 3)Complete the whole house fan in <br /> bathroom <br /> 4)Dryer exhaust should protrude from the <br /> wall at least 1"to make a connection and <br /> remove the screen at the termination. <br /> Unit A: <br /> 1)Complete the stove exhaust using solid <br /> metal duct,min.6"in diameter <br /> INSP12 =WS YS <br />