My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6524 TYEE RD A B 2020-06-30
>
Address Records
>
TYEE RD
>
6524
>
6524 TYEE RD A B 2020-06-30
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2020 2:59:38 PM
Creation date
6/30/2020 2:58:40 PM
Metadata
Fields
Template:
Address Document
Street Name
TYEE RD
Street Number
6524
Unit
A B
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2/14/2020 City of Everett Page 3/4 <br /> 1:16:28PM <br /> INSPECTION ACTIVITY REPORT <br /> 10/28/2019 10/28/2019 PLUMB 06-FINAL DXW CORRECTION (10/28/2019 3:35 PM SDP) <br /> Unit B: <br /> 1)Provide blocking behind the water heater <br /> 2)T&P relief line must have a 1'air gap at <br /> the drain. <br /> 3)Complete the tub trim <br /> Unit A: <br /> 1)Air gap fitting is required at the <br /> dishwasher connection. <br /> 2)T&P relief line for water heater must <br /> terminate between 24'-6"from the floor. <br /> ok to install a second T&P at 125 psi) <br /> 10/30/2019 10/30/2019 PLUMB 06-FINAL DXW APPROVAL (10/30/2019 1:00 PM DXW) <br /> as noted complete tub trim. <br /> 10/30/2019 10/30/2019 MECH 06-FINAL DXW CORRECTION John:425-293-5005 <br /> (10/30/2019 1:04 PM DXW) <br /> inspector req.installation book for electric <br /> range for proper clearance to combustibles <br /> and anti-tip req.unit A <br /> unit B complete anti tip for range. <br /> 11/15/2019 11/15/2019 MECH 06-FINAL DXW APPROVAL Bryan:559-907-0629 <br /> 11/15/2019 11/15/2019 PLUMB 06-FINAL DXW APPROVAL Bryan:559-907-0629 <br /> 11/18/2019 11/18/2019 BLDG 15-FINAL DWF CORRECTION Bryan:559-907-0629 <br /> PM inspection requested <br /> (11/18/2019 2:19 PM DWF) <br /> Duplex-unit A <br /> Upstairs bathroom window needs to be <br /> tempered safety glass. <br /> Unit B-need to install handrail as per IRC. <br /> 12/4/2019 12/4/2019 BLDG 15-FINAL DWF PARTIAL APPR Unit A only (12/4/2019 8:49 AM DWF) <br /> Recieved letter regarding correction for <br /> safety glass in bathroom window. <br /> Ok to occupy unit A only. <br /> Note: Contractor/owner still needs a <br /> final in unit B. <br /> 2/13/2020 2/13/2020 BLDG 15-FINAL DWF APPRVD-PERN john:425-293-5005 <br /> 2/13/2020 2/13/2020 ADMIN USE KLC APPROVAL <br /> ONLY** <br /> INSP12 CRWS YS TEM S <br />
The URL can be used to link to this page
Your browser does not support the video tag.