Laserfiche WebLink
t fl CITY OF EVERETT <br /> L `/ WATER FILTER PLANT OPERATIONS BUILDING <br /> PRE-DESIGN,DESIGN,BID PERIOD SERVICES,AND CONSTRUCTION PERIOD SERVICES FOR SEISMIC RETROFIT <br /> TABLE I.FEE PROPOSAL <br /> For. City of Everett Department of Public Works <br /> By: AECOM <br /> a <br /> d <br /> c —a) 1.)or c <br /> Illa c <br /> R 3 O <br /> 3 C U <br /> V.) W (a <br /> ` y toO E O <br /> U_ a. <br /> 0 a aa ci e o Laia. s d c o m x '@ ` <br /> P. `A c m m m <br /> O t3 O YN ❑ 0 T. O O <br /> • t- 76 u. U ❑ ❑ •-C 2 U <br /> s 9 Z a ❑ ❑ E R0 3 <br /> CO 0 t t U U U Q F F <br /> N .1. COCO CIMG) <br /> ti a <br /> Task Hourly Rate • <br /> co n r�i v cNi m <br /> 69. » va di 63 ca <br /> 1 Project Management 36 2 4 32 74 $9,413.15 <br /> 2 Pre-design 0 21 28 110 34 11 24 0 228 $33,489.97 <br /> 2.1 Documents Review 4 20 24 $3,505.60 <br /> 2.2 Kick-off Meeting and Site Investigation 5 16 6 27 $4,565.68 <br /> 2.3 Workshops 10 20 12 42 $6,165.60 <br /> 2.4 Pre-design Development and Planning-level 4 4 40 16 11 18 93 $12,219.76 <br /> Construction Cost Estimates <br /> 2.5 Pre-design Memorandum 2 4 30 6 42 $5,733.28 <br /> Direct Costs(travel-related costs,copies) $1,300.05 <br /> 3 Design 0 20 23 203 32 67 110 8 463 $60,039.53 <br /> - _ 3.1 50%Design Development _. 2 6 70 24 26 42 170 $21,579.04 <br /> 3.2 Design Review Meetings -- 1-2 4 16 A' -$$2,547.7& - <br /> 3.3 Permit Package - .. 2 10 99 8 33 54 4 210 $26,294.35 <br /> 3.4 Permitting Support 2 4 8 4 8 26 $3,367.39 <br /> 35 Construction Documents Development 2 3 22 4 6 4 41 $5,284.27 _, <br /> Direct Costs(travel-related costs,copies) _ $966.70 <br /> 4 Bid Period Services 0 1 4 8 4 0 0 0 17 $2,606.33 <br /> Respond to Bidder Questions 4 8 12 $1,833.66 <br /> Pre-bid Meeting 1 4 5 $739.31 <br /> Direct Costs(mileage) $33.35 <br /> 5 Construction Period Services 0 5 4 102 15 0 16 0 142 $19,851.02 <br /> Review Structural Submittals 2 40 42 $5,932.64 <br /> Respond to RFIs(15 EA) 2 45 47 $6,629.28 <br /> Site Observations(4 EA) 10 15 25 $3,543.68 <br /> Construction Meetings via Telecon(10 EA) 5 5 10 $1,526.00 <br /> Record Drawings 2 16 18 $1,619.07 <br /> Direct Costs(travel-related costs,copies) $600.35 <br /> 6 Undefined Services(Including: Mechanical,Electrical, $60,000.00 <br /> Plumbing) <br /> Fee Proposal Total' 0 83 61 423 89 78 150 40 924 $185,400.00 <br /> 3/5/15 AECOM <br /> 88 <br />