Laserfiche WebLink
10 <br /> EXHIBIT A <br /> • Workshops and Design Review Meetings are assumed to be held at the City's <br /> office location. <br /> • Technical specifications will be in 1997 CSI format(i.e., 16 Divisions). <br /> • The City will prepare Instructions to Bidders and Division 0 specification sections. <br /> • The proposed budget for Task 3,4 and 5 are only our best estimate at this time. <br /> The proposed budget addresses only the key structural upgrades listed in the <br /> FEMA Grant: <br /> o Add reinforced topping slabs to the roof/floor pre-cast diaphragms, and <br /> o Add steel connectors to each.floor/roof panel to improve the connections <br /> between the panels and the walls. <br /> • The scope and fee for structural engineering design drawings assumes the <br /> following drawings will be developed. <br /> Draft Drawing List <br /> 1 Cover Sheet <br /> 2 Design Criteria <br /> 3 General Notes <br /> 4 Recommended Construction Sequence <br /> 5 Demolition Plans <br /> 6 Demolition notes <br /> 7 Roof Plan <br /> 8 Floor Plan - <br /> 9 Building Sections <br /> 10 Sections and details for Roof Reinforcement• <br /> 11 Sections and details for Floor Reinforcement <br /> 12 Sections and details for panel to wall connections <br /> 13 Misc. Sections and details,Sheet 1 <br /> 14 Misc. Sections and details,Sheet 2 <br /> FEE PROPOSAL <br /> The fee proposal, corresponding to the six tasks described above, is provided as Table <br /> 1. The total amount for this scope of work is $185,400. <br /> J:\Projects\E\Everett,City of\Operations Building Seismic Upgrade\Project Management\Scoping\revised 03-18- <br /> 15\2 Draft Scope of Work_Operations Bld Seismic Upgrade 04-14-15.docx <br /> Page 8 of 8 <br /> 87 <br />