My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015/05/06 Council Agenda Packet
>
Council Agenda Packets
>
2015
>
2015/05/06 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2020 10:56:21 AM
Creation date
7/1/2020 10:52:12 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
5/6/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t2 <br /> Exhibit A <br /> Scope of Work <br /> Consulting Design Engineering Services <br /> City of Everett <br /> Water Main Replacement"Q" —Phase 2 <br /> UP No. 3613 <br /> !. Project Description and Purpose ._ <br /> The City plans to replace an existing 30 year old 2-inch PVC water pipe that currently hangs off <br /> the east side of the BNSF railroad trestle across Union Slough. (See Figures 1): <br /> The existing pipe is about 550 feet long. The intent is to construct an 8-inch steel or DI carrier <br /> pipe fastened to the existing concrete piers. See Figure 2. The piers are spaced approximately <br /> 20 feet on center. The carrier pipe will carry a new 2-inch HDPE pipe that will need to be <br /> reconnected to existing pipe at both ends. <br /> The City will be preparing the plans and specifications in-house and are looking for consulting <br /> design expertise to assist with carrier pipe and anchor design and specifications. The <br /> Consultant's design must meet or exceed BNSF's engineering requirements: <br /> In , littipn, the City is also seeking assistance in preparing specifications for performing the <br /> construction using barges. As long as no work disturbs the slough bottom the City will not be <br /> required to obtain environmental permits. 4.. <br /> The City's current license with BNSF allows for this work. <br /> II. Task Assignments <br /> Consulting firm will provide design services necessary to design the proposed carrier pipe and <br /> anchors. The specific elements include, but are not limited to: <br /> A. Attend Kickoff Mtg <br /> 1. Within 5 working days of NTP, COE PM will schedule a kickoff meeting to review <br /> Scope of Work and schedule. <br /> B. Site Visit and Research <br /> 1. Attend a City coordinated site visit with City and BNSF representatives. <br /> 2. Review available BNSF record drawing information. <br /> C. Design Report Memo <br /> 1. Prepare short, concise design report explaining anchoring and carrier pipe options <br /> considered and recommendation as to which to move forward with to include in <br /> project plan. <br /> 2. Be signed by WA licensed Structural Engineer. <br /> 3. Include design calculations and all documentation BNSF engineering may require. <br /> Page 12 137 <br /> Rrnrdn and PSA 2015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.