My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015/05/06 Council Agenda Packet
>
Council Agenda Packets
>
2015
>
2015/05/06 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2020 10:56:21 AM
Creation date
7/1/2020 10:52:12 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
5/6/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
n <br /> City of Everett Exhibit A—Scope of Work <br /> Water Main Replacement Q—Ph 2 April 2015 <br /> UP No. 3613 Page 2 of 4 <br /> D. Detail Drawings <br /> 1. Provide detail drawing for anchor strap and anchoring fitting to concrete piers. <br /> E. Specifications <br /> 1. Provide technical and material specifications for carrier pipe, anchors, and work from <br /> barges in WSDOT format for inclusion into the City's Project Manual. <br /> F. Cost Estimate <br /> 1. Provide cost estimate for recommended work. <br /> Deliverables: <br /> • 2 hardcopies, 1 PDF & 1 Word file for Design Memo. <br /> • Electronic detail drawing CAD files in AutoCAD Civil 3D 2015 format&signed PDF file. <br /> • Proposed schedule for major tasks. <br /> Assumptions: <br /> • City to request BNSF record drawings. <br /> • Detailed load bearing analysis for attaching to concrete piers will not be required. <br /> • No environmental permits required as long as slough bottom isn't disturbed. <br /> Ill. Items Not Included in this Task Agreement: <br /> The following services are not included in this Task Agreement. If, during the course of the <br /> project, the need for any of these services is identified, an adjustment to this Scope of Work will <br /> be heeded. <br /> • Topographic field survey. <br /> • Construction survey. <br /> • Structural calculations regarding adequacy of existing bridge or ability to <br /> accommodate carrier pipe and anchors, other than calculating material weights. <br /> IV. Project Milestones: <br /> 1. Provide detailed schedule including, at"a minimum, following milestones: <br /> a. Start, draft design memo, draft details, draft specifications and final <br /> documents due. <br /> V. Proposal Price <br /> 1. Proposal price will be determined based on consultants estimated level of effort <br /> hours submitted times Consultants multipliers plus expenses. COE allows a 5% <br /> markup on subcontractor's fees and no markup on expenses. <br /> Page 13 138 <br /> Rrn,,n and r'alrlwall PEA9f115 <br />
The URL can be used to link to this page
Your browser does not support the video tag.