Laserfiche WebLink
Agency should forward the letter of credit or the surety bond to BNSF Manager of Credit, 2400 Western - <br /> Center Boulevard, Fort Worth, Texas 76131 (phone: 817-352-4194). If posting a cash.deposit pursuant <br /> to this provision, contact BNSF Manager of Credit to obtain the BNSF account information.**************1 <br /> ARTICLE IV—JOINT OBLIGATIONS <br /> IN CONSIDERATION of the premises,the parties hereto mutually agree to the following: <br /> 1. All work contemplated in this Agreement must be performed in a good and workmanlike manner <br /> and each portion'must be promptly commenced by the party obligated hereunder to perform the same <br /> and thereafter diligently prosecuted to conclusion in its logical order and seq sir . rthermore, any <br /> • changes or modifications during construction which affect BNSF will be _!i'a ec ' r, f; SF's written <br /> approval prior to the commencement of any such changes of t odificati• from �_1� : F Project <br /> Manager. <br /> 2. The work hereunder must be done in accordance with the o•_•e 'eoln -ment- gilt forth on <br /> Exhibit F and the detailed plans and specifications approved by BNSF. <br /> 3: Agency must require its contractor(s) to reasonably -[I`ere 'ro C:,construction schedule <br /> • for all Project work. The parties hereto mutually agree th- :!' F's failu -iCr,com•tte the railroad work in <br /> accordance with the construction schedule due to inclem- -ather or u1leseen railroad emergencies <br /> will not constitute a breach of this Agreerrient b BNSF will not :Abject BNSF to any liability. <br /> Regardless of the requirements of the construc kteritdule, o 0_ •re .=1 '4's the right to reallocate the- <br /> labor forces assigned to complete the railroa• \t.,irk the ev-•t Coif vet--mergency to provide for the <br /> immediate restoration of railroad operator_ Jh SF or , i-late• oads) or to protect persons or <br /> property on or near any BNSF owned (9)014V/ . BNSF II root be it0t - for any additional costs or <br /> expenses resulting from.anysuch real• = ion • labor for The i=@ ies mutually agree that any <br /> reallocation of labor forces by BNSF c i3 ti nt to thi-!Jq ision and any direct or indirect consequences or <br /> costs resulting from any such reallocate \'Pi not con i ir a breach of this Agreement by BNSF. <br /> 4. BNSF will have the•14ji ;; • co -iii ction work on the Project if any of the following events <br /> take place: (i) Agency (or Ai+ of its @ ii actor-)11:. orms the Project work in a manner contrary to the <br /> plans and spe ications - I..;Ar ove• lav' : (ii) gency (or any of its contractors), in BNSF's opinion, <br /> prosecute- 000- two t` a,ilt ner,fdlii el is hazardous to BNSF property, facilities or the safe and <br /> expedif.i! - ove ent of railro4 traffic, ( the insurance described in the attached Exhibit C-1 is <br /> cancel during the course o i the P -ct; or (iv) Agency fails to pay BNSF for the Temporary <br /> Constr•.r= ion Lice. Gr tI Ea eiu-i pursuant to Article II, Section 1 of this Agreement. The work <br /> stoppaeet.• •U '.. un 1 c1, necessary actions are taken by Agency or its contractor to rectify the <br /> situation • isfaction o o SF's Division Engineer or until additional insurance has been delivered <br /> to and accepted by BNSF. I e event of a breach of(i)this Agreement, (ii)the Temporary Construction <br /> License, or (iii) t e Ease ter °BNSF may immediately terminate the Temporary Construction License or <br /> the Easement. *ALE 11 5r stoppage under this provision will not give rise to any liability on the part of <br /> BNSF. BNSF's righ' o op the work is in addition to any other rights BNSF may have including, but not <br /> limited to, actions or suits for damages or lost profits. In the event that BNSF desires to stop construction <br /> work on the Project, BNSF agrees to immediately notify the following individual in writing: <br /> 5. Agency must supervise and inspect the operations of all Agency contractors to assure <br /> compliance with the plans and specifications approved by BNSF, the terms of this Agreement and all <br /> safety requirements of the BNSF railroad. If BNSF determines that proper supervision and inspection is <br /> Form 0105 Rev.06/01/05 <br /> 27 <br />