Laserfiche WebLink
• <br /> • <br /> not being performed by Agency personnel at any time during construction of the Project, BNSF has the <br /> right to stop construction (within or adjacent to its operating right-of-way). Construction of the Project will <br /> not proceed until Agency corrects the situation to BNSF's reasonable satisfaction. If BNSF feels the <br /> situation is not being corrected in an expeditious manner, BNSF will immediately notify <br /> for appropriate corrective action. • <br /> • 6. Agency agrees to provide, to the BNSF Manager Evidence Preservation, such Project <br /> documentation and records as are agreed to between the parties including: any project applications; any <br /> letters of approval and/or authorization forms (eg. PR-1240 or the equivalent); any and all payment <br /> Voucher forms requesting FHWA reimbursement (eg. PR-20 or the equivalent) or any other such project <br /> authorization or funding records as BNSF may request from time to time. Such records will be provided <br /> by the Agency to BNSF on a mutually agreeable schedule or within two (2) months after such records are <br /> generated or received by the Agency. Section 130 Documentation shall be provided to BNSF in the one <br /> of the following manners: <br /> Manager Evidence Preservation . ` , / <br /> 2600 Lou Menk Drive,AOB-3 • / <br /> Fort Worth, Texas 76131 .'f - <br /> Or electronically to: • <br /> Manager Evidence Preservation <br /> Section130(cr�,bnsf.com <br /> 7. Pursuant to this section and Article II, Sec oe• erein, g-ncy t r , reimburse BNSF in full for <br /> the actual costs of all work performed by BNSF ter' It Agree eiII 1 BNSF's Share as set forth in <br /> Article IV,Section 6 herein. BNSF's Share eu-st paid upon comp - el,of the Project. <br /> 8. •- All expenses detailed in statem-t sen`i 'gency pw,v ant t• icle II, Section 6 herein will <br /> comply with the terms and provisions agile Federalir•• Highway Program.Manual, U.S. Department of <br /> Transportation, as amended from time a ire, which a- al is hereby incorporated into and made a part <br /> of this Agreement by referenc-. t•le partie-u't tually agr-- that BNSF's preliminary engineering, design, <br /> and contract preparation co clesc4itial in Aloe II, Section 2 herein are part of the costs of the Project <br /> even though such work m.+/Dave pr-eed-d the g. - of this Agreement. <br /> 9. To •., . mutua I.') gr--1 Iat n•(Bit struction activities for the Project, nor future maintenance <br /> of the •tle ure o ce complete•(will ba p-rmitted during the fourth quarter of each calendar year. <br /> EmergnG y work will be_ term' e• only' ton prior notification to BNSF's Network Operations Center <br /> (telep o e numbe.: ;Oa 83 45& parties hereto mutually understand and agree that trains cannot <br /> be subj.-Me.e• to de . •urine time period. <br /> 10. Subject to the restrilgts imposed by Article IV, Section 9 above, the construction of the Project <br /> will not commence until Agency gives BNSF's Manager of Public Projects thirty (30) days prior written <br /> notice of such e e e•meat. The commencement notice will reference BNSF's file number <br /> and D.O.T. Crossing No. and must state the time that <br /> construction activities will begin. <br /> 11. In addition to the terms and conditions set forth elsewhere in this Agreement, including, but not <br /> limited to, the terms and conditions stated in Exhibit F, BNSF and Agency agree to the following terms <br /> upon completion of construction of the Project: <br /> (a) Agency will own and maintain, at its sole cost and expense, the Structure, the highway <br /> approaches, and appurtenances thereto, lighting, drainage and any access roadways to <br /> BNSF gates installed pursuant to this Agreement. BNSF may, at its option, perform <br /> maintenance on the Structure in order to avoid conflicts with train operations. BNSF will <br /> notify Agency prior to performing any such maintenance on the Structure. In the event <br /> such maintenance involves emergency repairs, BNSF will notify Agency at its earliest <br /> Form 0105 Rev.06/01/05 <br /> 28 <br />