My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11229 19TH AVE SE SILVER LAKE TOWNHOMES WHOLE SITE 2020-07-01
>
Address Records
>
19TH AVE SE
>
11229
>
SILVER LAKE TOWNHOMES WHOLE SITE
>
11229 19TH AVE SE SILVER LAKE TOWNHOMES WHOLE SITE 2020-07-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2020 2:20:56 PM
Creation date
7/1/2020 2:00:27 PM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
11229
Tenant Name
SILVER LAKE TOWNHOMES WHOLE SITE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
405
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2014 Stormwater Management Manual for Western Washington shall be used to design and <br /> determine the feasibility of on-site stormwater management BMPs. <br /> 15.Construction Stormwater Pollution Prevention will be required for this project in compliance with <br /> City standards. in addition,if the overall project will disturb more than an acre of land,the <br /> applicant must apply for coverage under the Washington State Department of Ecology's <br /> Construction Stormwater General Permit. <br /> 16. Lack of comment on the submitted site plan and storm drainage report does not constitute <br /> approval of these submittals. The City of Everett does not conduct detailed stormwater reviews of <br /> documents until after a project has received a land use approval. <br /> 17.All driveways and sidewalks must be installed to satisfy ADA regulations. <br /> 18.Provide and get approval for traffic control prior to any interruptions to the local street network. <br /> 19.The Primary construction access point for the site shall be from 23`i Dr SE. <br /> 20.Provide ADA-approved ramps at all crosswalks.Receiving ramps may be required to be upgraded <br /> to meet ADA standards if they do not meet them already. <br /> 21.The access point requires a stop sign. All roadways and driveways must meet City of Everett <br /> Design Standards. <br /> 22.Provide pedestrian access to City sidewalks. <br /> 23. All traffic control markings and devices on driveways within 50' of the right-of-way shall be <br /> MilTCD compliant. <br /> 24.The parking layout must be consistent with City of Everett Standards. <br /> 25.A minimum width of 20' is required for all access aisles for parking access,measured from curb <br /> to curb or back of parking space. <br /> 26.Parking spaces shall be a minimum of 18.5' long in front of the garages. <br /> 27.The dumpster locations must be verified with the refuse company and may not be located in <br /> required parking spaces. <br /> 28.This project will be subject to Transportation Mitigation in accordance with Ordinance 3387-14 <br /> (codified as EMC 18.40)and subsequent revision.The applicant is encouraged to obtain a copy of <br /> the Ordinance and determine applicable mitigation fees and/or other requirements prior to <br /> building permit application. The actual charges and requirements shall be as per the information <br /> on the approved plans at the time of building permit issuance and the ordinance in effect at that <br /> _ MA16-008 <br /> Page 11 of 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.