Laserfiche WebLink
PUBLIC WORKS <br /> b. Please see all redlines on the attached plans for required corrections in addition to all <br /> comments listed below. Frequently, redlines will be stand-alone and will not have an <br /> associated item in this corrections letter. Likewise, comments below may not have i 1 <br /> associated redlines. t ild-Re ci eve, Red il,",a,,r. .re.—i mei:a" <br /> c. Please add the street name of the pri/vate drive and all townhouse addresses to the site <br /> plan as redlined. <br /> y tAf <br /> d. Please add finish floor elevations to each unit on the grading plan. ,".` s cZed ,V <br /> e. An oil/water separator shall be in talled for the drainage system from the parking area/ <br /> r r 0, - S" V <br /> f. Please add rim and invert elevations to each structure on the drai age plan. All pipes <br /> should additionally be called out with size, material, and slope on both plan view (sheet <br /> 2)and profile (sheet 3). See redlines. <br /> g. Check the proposed grade line on the profiles (sheet 3), as it seems very odd and not <br /> smooth grading as shown on the plan view. Ensure that the section cuts for the profiles <br /> are taken through the center of the pipe/structures. Also ensure that the stations that are <br /> called out at the bottom of the profiles match the location of the profile/stationing in plan <br /> view. Otherwise, select a different labeling method,perhaps showing a section cut on the <br /> plans. ,'. C 5 r 0ct.41,...e....., <br /> na le 7 <br /> h. Please add a legend for all elementsgwn in the profiles on sheet 3,or label each line in <br /> each profile. 3 - C5 A V <br /> i. Please add etailed in orn}ation to the detailed pond plan shown on sheet 5. <br /> j. Since the units will be individual townhomes, a separate water service should be shown <br /> for each unit on sheet 5 (per owner's direction at the permit counter. Coordinate with <br /> owner prior to this r ision). A separate fire service will be required for each building(5 <br /> total). .,v!s {t <br /> k. On sheet 6, the side sewers are acceptable as shown, one for each building, however they <br /> must have ai cl-an•ut p .vid meeting all c 'teri�of the 2015 UPC. <br /> A 0 '," '` O Ort V <br /> I. The water main must be looped. To do this, it will need to connect into the main stub out <br /> on the south side of the property. See the map taped into sheet 6 and as redlined. <br /> Meeting this requirement may require a slight redesign o the layout of the on-site water <br /> g <br /> main. o - . /0 re,�'i <br /> m. The on-site water main shall be staked with an easement to the City of Everett. The <br /> easement shall be 5' on one side of the main and 10' on the other. The easement shall <br /> extend to the back side of al water meters, and at least 5' beyond the back side of each <br /> 4 Page 2 of ‘, <br />