Laserfiche WebLink
PUBLIC WORKS <br /> jIlir <br /> hydrant. See the attached easement form, which shall have a legal description and <br /> C� . ,I exhibit {{flrned in and reviewed prior to collecting signatures. ou can submit this with <br /> \,, <br /> _ your resubmittal, or anytime as long as it is prior to permit issuance. C) <br /> n. On sheet 7, please add the City's four additional required TESC notes, as redlined. <br /> Please also extend the proposed silt fence to the west side of the property around the <br /> pond and install inlet protection,where existing structures exist. el- jS ,;: A <br /> it fdl_ , / ; , <br /> o. The City updated its Design and Construction Standards an Specifications for "n <br /> Development(DCSS) manual at the end of 2016, which includes updates to the standard �"�' <br /> drawing names and numbers. Please update all callouts/references to the City's standard <br /> drawing numbers to match our current manual. You can access the current ve sion <br /> onli e at: https://yverettwa.gov/l 531/D ign-Co struction-St dards Rev,t e_ ✓ . <br /> p. Update the SWPPP report to reflect only Cons do Stormwatei'Pollution Prevention <br /> elements and leave all other items to be exclusively addressed by the drainage report. <br /> Note that the current stormwater manual requires 13 Elements to be addressed (# 13 is <br /> protection of LID). Each BMP selected must be one that specifically satisfies that <br /> specific element, per Ecology criteria. See the attached checklist to see which BMPs <br /> satisfy which elements. You may use the attached and submit 2 copies or work this <br /> information into your SWPPP if you want to discuss how you are addressing each <br /> element further. Please note that all of the updates you make to your SWPPP should be <br /> correctly reflected in MR2 of your Draina,ge po. . Pro v t <br /> s „ , . <br /> q. Each gate shall be an Opticom ate with a o box an e i. Coordina1 ith the Fire <br /> Department for specifics (Jim yenturo, AssistantjV ( hal, i 42i:57-8124, ; <br /> J Venturo(?a everettwa.gov). , G,. - ;, i , ) :io, r <br /> 2. The comments below were generated from this project's Stormwater Re .=wer. If you have any <br /> questions regarding these comments, please contact Erik Emerson with the City of Everett <br /> Surface Water Department(425-257-8995 or EEmerson a@everettwa.gov). <br /> a. The drainage report and drainage design will need to be revised to meet the City's <br /> current stormwater standards, which is the Washington State Department of Ecology's <br /> 2012 Stormwater Management Manual for Western Washington, as amended in 2014 <br /> (2014 SWMMWW). The City was required to adopt this code on 1/1/2017. Since the <br /> application for this project was submitted after that date, this project must comply with <br /> 2014 SWMMWW standards. Please also see amendments to this manual as found in <br /> Chapter 4 of the City's Design and Construction Standards and Specifications for <br /> Development manual. https://everettwa. ov/1531/Design-Construction-Standards <br /> F. t a 5' � - . to <br /> 7 Page 3 of 4 <br />