Laserfiche WebLink
PUBLIC WORKS <br /> notarized and can take place at the permit counter if needed, typically done at the <br /> time of permit issuance for convenience to the owner. <br /> Will be provided as requested. <br /> The Permit Counter is open Monday through Friday from 7:30am-12:OOpm and from <br /> 1:OOpm-4:OOpm(closed between 12:OOpm-1:OOpm for lunch). <br /> b. Please see all redlines on the attached plans for required corrections in addition to all <br /> comments listed below. Frequently, redlines will be stand-alone and will not have an <br /> associated item in this corrections letter. Likewise, comments below may not have <br /> associated redlines. Please indicate to the City that all redlines have been adequately <br /> addressed by providing checkmarks or notes next to the City's redlines to indicate that it <br /> has been picked up or to answer a reviewer's question. <br /> Attached as requested. <br /> c. The on-site water main shall be staked with an easement to the City of Everett. The <br /> easement shall be 5' on one side of the main and 10' on the other. The easement shall <br /> extend to the back side of all water meters, and at least 5' beyond the back side of each <br /> hydrant. See the attached easement form, which shall have a legal description and exhibit <br /> turned in and reviewed prior to collecting signatures. You can submit this with your <br /> resubmittal, or anytime as long as it is prior to permit issuance. <br /> Will be provided as requested. <br /> d. Each gate shall be an Opticom gate with a Knox lock and key override, and a gate strobe. <br /> Coordinate with the Fire Department for specifics (Jim Venturo, Assistant Fire Marshal, <br /> 425-257-8124, JVenturo@everettwa.gov). Add this note to the second gate at the north <br /> end of the site. <br /> Notes have been provided at each gate location. <br /> 2. The comments below were generated from this project's Stormwater Reviewer. If you have any <br /> questions regarding these comments,please contact Erik Emerson with the City of Everett Surface <br /> Water Department (425-257-8995 or EEmerson@a,everettwa.gov). <br /> a. The proposed infiltration zones appear to be properly sized based on the geotechnical <br /> report provided. However, since these facilities will receive runoff from roadway areas <br /> the facilities must be designed in accordance with the City's current Stormwater <br /> Management Manual (SWMM), including: <br /> i. The SWMM recommends that pretreatment be provided for all flows to an <br /> infiltration facility. At a minimum all flows, including roof runoff, should be <br /> routed through a full sump catch basin with floatables separator. <br /> Full sump catch basin with floatables separator have been <br /> provided at all locations. <br /> Page 2 of 6 <br />