PUBLIC WORKS <br /> b. Please see all redlines on the attached plans for required corrections in addition to all <br /> comments listed below. Frequently, redlines will be stand-alone and will not have an <br /> associated item in this corrections letter. Likewise, comments below may not have <br /> associated redlines. Please indicate to the City that all redlines have been adequately <br /> addressed by providing checkmarks or notes next to the City's redlines to indicate that it <br /> has been picked up or to answer a reviewer's question. Please coordinate redlines with <br /> architectural and landscape designers to ensure that all resubmitted plans sets have <br /> consistent backgrounds and that changes are not adversely affecting the other designers' <br /> requirements, codes, and designs. <br /> i. ADA connectivity is required. Add ramps or other access devises as necessary to <br /> provide connectivity from sidewalk on 19th to each of the buildings. See redlines. <br /> Pavement should be marked with striping or other material (i.e. stamped <br /> concrete) to identify the pedestrian walkway/connectivity alongside the access <br /> drive. This connectivity is required to the open space at the east side of the lot. <br /> Revise landscaped pathway to connect to sidewalk and provide a ramp to access <br /> this area. <br /> See attached plans ADA ramps added with striping. <br /> ii. Pond area needs to be checked and potentially revised. Check calculations for <br /> required volume against what is provided on the drawings. Revise plans as <br /> necessary to meet the required calculated volume. If changes are needed in the <br /> drainage report to reflect any revisions to the pond, new drainage reports will be <br /> required to be submitted. Pond area also needs to address the location of the west <br /> maintenance gate and the 11 ft wall. If there is a wall here, structural calculations <br /> need to be provided for the wall design (2 copies) and details should be provided <br /> for the wall design. If there is not a wall and it is instead soil, revise to meet <br /> design requirements for side slopes. Coordinate with architectural and landscape <br /> designers as to not impact their codes/requirements/designs in an adverse <br /> manner. <br /> Noted see attached revised plans. <br /> 2. The comments below were generated from this project's Stormwater Reviewer. If you have any <br /> questions regarding these comments, please contact Erik Emerson with the City of Everett <br /> Surface Water Department(425-257-8995 or EEmerson@everettwa.gov). <br /> a. See redlines by Erik Emerson to pick up the remaining stormwater comments. <br /> Revised <br /> b. Drainage report submitted on 9/15/2017 is currently approved. However, if changes are <br /> made to the pond volume from what is shown in the report, a revised report will be <br /> required to be submitted (2 copies) to be consistent with the plans. See redlines for <br /> clarity. <br /> No changes to pond volume. <br /> 3. The following required site plan corrections (for the civil plans and landscape plans) have been <br /> requested by this project's Planning Reviewer. If you have any questions regarding these <br /> comments, please contact Grace Pollard with the City of Everett Planning Department (425- <br /> 257-8807 or GPollard@everettwa.gov). <br /> Page 2 of; <br />