Laserfiche WebLink
"44 <br /> PUBLIC WORKS <br /> 3. The comments below were generated from this project's Stormwater Reviewer. If you have any <br /> questions regarding these comments, please contact Jane Zimmerman with the City of Everett <br /> Public Works Department(425-257-8885 or JZimmerman@everettwa.gov). <br /> a. Drainage Report: <br /> i. Please see the attached markups for the drainage report and update accordingly <br /> for your resubmittal. <br /> b. Civil Plans: <br /> i. General: <br /> 1. For clarity, please only include the construction notes on each plan that <br /> actually pertain to the given plan. <br /> 2. Construction note 4—is City Standard Drawing No. 616 really applicable <br /> in this case? <br /> ii. SV-04: <br /> 1. Please provide complete and accurate as-builts of the portion of the <br /> Riverside Road drainage system indicated by the red line in the "snip" <br /> below. Field observation indicates that the provided information is <br /> inaccurate and incomplete. <br /> r r <br /> ,%,..-r- .'// -rte r `-' - .^r <br /> ~ __,---2."-----,.-------:::--::;--' i <br /> �_.I. -_ ter -_-_::::::>---„..--:,-_:::::--:::--'-;,_:•' - _� .h <br /> iii. C2.2: <br /> 1. Please include the City's standard storm drainage notes. <br /> ()age 2 of 4 <br />