Laserfiche WebLink
PUBLIC WORKS <br /> MEMORANDUM <br /> TO: Elise Gronewald, Port of Everett, 425-388-0630 <br /> FROM: Sabrina Fandler, Engineering/Permit Services, 425-257-7813 <br /> DATE: 4/26/2017 <br /> SUBJECT: Plan Review Comments for Public Works Permit Application <br /> PROPOSAL: Riverside Rd and 8th St Improvements (Port of Everett) <br /> LOCATION: <br /> PERMIT#: PW1703-047 <br /> A review of this project by the Engineering/Permit Services Division indicates that the following <br /> revisions should be made and/or the following conditions must be met: <br /> 1. Please see the compiled list of comments below and the attached redlines to revise your plans <br /> accordingly, prior to resubmitting to the Permit Services Counter. If you have any questions <br /> regarding the comments/redlines or need anything further, please directly contact this project's <br /> Public Works plans reviewer, Sabrina Fandler, at 425-257-7813 or SFandler@everettwa.gov. <br /> a. Please resubmit the following items to the Permit Services Counter with your <br /> resubmittal once all requested revisions have been made: <br /> i. Transmittal Sheet: (1) available online at https://everettwa.gov/Permits or at the <br /> Permit Counter-2"d Floor, 3200 Cedar Street. <br /> ii. Plans: (4) sets of revised plans plus original City Markups. <br /> iii. Drainage Report: (2) copies of revised drainage report <br /> iv. Cost Estimate for Permit Fee Calculation Form: (1) copy of cost estimate form <br /> filled out for the City to use to calculate the Public Works Permit Fee. <br /> The Permit Counter is open Monday through Friday from 7:30am-12:OOpm and from <br /> 1:OOpm-4:OOpm (closed between 12:OOpm-1:OOpm for lunch). <br /> b. Please see all redlines on the attached plans for required corrections. Frequently, redlines <br /> will be stand-alone and will not have an associated item in this corrections letter. <br /> i. See attached additional TESC notes to add to sheet C2.1. I can email these to you <br /> if you want to copy/paste them into CAD. <br /> 2. Please incorporate any and all of the required changes to the stormwater pump system as <br /> directed by Rick Osborne, City of Everett TSG. Separate dialogue via phone and email has <br /> taken place regarding this issue. Coordination shall take place as needed (Rick Osborne, <br /> ROsborne@everettwa.gov, 425-257-7230). <br /> Page 1of4 <br />